Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Can anyone explain how the vector diagram of a transformer
which doesn't have name plate be found whether it is
Dy11/Dy5/Yd11 and so on?

Answer Posted / kalidass

Yah! can.
If Dy11
Primary winding having only 3 terminals with high
resistance and secondary havign 4 terminals with low
resistance.

If Yd11
Primary having 4 terminals with high resistance and
secondary having 3 terminals with low resistance.

If Dy5
This is not a verctor group.

Eppdi???

Is This Answer Correct ?    8 Yes 30 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which contains in POLE ASSEMBLY of a 11KV Kirloskar-make SF6 (Model No-FP620A12)? Will u clarify with drawing?

2121


How vfd saving power.

1975


We have 90mX100m hangar with 16 no.of supporting pillar. It is required to provide power supply on all pillars. what is suggested earthing scheme for hangars.

1940


which model T or pie model is prefarable in power syatem

1824


why the protection turbo generators is most complex?

1975


Classify milling machines.

1080


What is the basic principal, by which DC voltage level is increased more than the supplied AC voltage during conversion. As upto AC level it is contorrled by firing anlge but after maximum level how is it possible.Please clear picture. OR we have to supply the higher level AC?

1903


why various test are performed on electrical panels & power cables before commissioning on site & what are these test???

1935


We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible

1932


what things to be considered when designing UPS

1728


xfhnchncv?

1850


What is lighting kitts.

2055


I COMPLITED MY B.TECH AND 10TH CLASS WITH 70%MARKS BUT 12TH CLASS 55%MARKS..CAN I GET INDIAN RAILWAY RECUREMENT EXAMINATION?

2135


which fault is severe and why?between lll fault and lllg fault which fault is severe and y?

2450


Why is voltage is required to be within permissible range for an electrical equipment?

1651