When test plan will be prepared in v-model?
Answer Posted / karthik.g
The test plan will be prepared in various stages in a V
Model.
The UAT Test plan will be prepared at the requirement
analysis phase as one of our friend has said and the System
test plan will be prepared during the High Level Design
Phase. The integration test plan during the Low Level
Design phase.
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Write notes on apparel testing equipments.
How can I use bugzilla in my company to track a bug and to allow the client to see the bug report online throughbugzilla. Please explain in detail. I am really need this.
What makes a good test engineer?
What is ofx testing?
You have a testing team of 10 members, and now you have to reduce it by 5 member and you dont want to increase risk in your product, you are try to cover all functionality to test. What test Strategy you follow.
Describe your experiences with code analyzers.
what is scrum how with ex?
1.What types of documents would you need for QA, QC, and Testing?
What is the difference between code walkthrough and code review? What is the difference between walkthrough and inspection?
Need to know about Quality Center in brief
In interview How do explain in Testcase of Calcuator,Cellphones, Email testing?
What type of questions will be asking for 2 years experience candidate in manual testing?
What is the difference between a bug, a defect and an error?
Password is having 6 digit alphanumeric then what are the possible input conditions?
What is frame level testing and how do we test it?