What are the environmental settings for data stage,while
working on parellel jobs?
Answer Posted / kiran
hai ..,
This is Kiran
Your Quetion is wrong.and Environmental variable set in job
properties while using in jobs level and project level set
in DS Admin.
if any send mail me mkk143@gmail.com and call-9393363309
Is This Answer Correct ? | 2 Yes | 5 No |
Post New Answer View All Answers
What is a merge in datastage?
how to write server Routine coding?
table actions available in oracle connector?
If you want to use a same piece of code in different jobs, how will you achieve this?
Differentiate between Join, Merge and Lookup stage?
What are the types of jobs we have in datastage?
What is quality stage?
What are the different plug-ins stages used in your projects?
What is the difference between Datastage 7.5 and 7.0?
Hi guys, Please design a job for dis requirement with derivation(solution). my source table like dis. emp_no qualification 1 a 1 c 2 a 3 c 3 b To loaded to target like dis emp_no qualification 1 b 2 b 2 c 3 a my requirement is every employer have three qualifications i.e a,b and c. what qualification missed in source table that will be move to target systems. Hope u got it the requirement. Right Thanks.
what is ds administrator used for?
project Steps,hits, Project level HArd things,Solved methods?
Define repository tables in datastage?
Explain usage analysis in datastage?
How do you import and export data into datastage?