Answer Posted / kumarabharathi
Soft starters nothing but thyristor control starters,this
different form VFD drives,All VFD drives are soft starters
but All soft starters are not Drives,In VFD we can adjust
the speed,Torque & master-slave operation,But in soft
starters is used only to reduse starting current of motor
And for soft starting of motors.
| Is This Answer Correct ? | 16 Yes | 7 No |
Post New Answer View All Answers
what is the criterion for selecting vector group of Transformers ? i mean how to decide vector group of Generator transformer, substation trasformer and transformer at consumer end
What are the types of windings present in the ceiling fan? What winding will be effective first when we started the fan?What are the resistance and inductance ratios comparatively at the initial speed and full speed of the fan?
How does a television work?
What is meant by cold loop test in instrument
What are the difference between normal application Transformer and Solar application Transformer?
hi, could someone help me to find a control design for syncronising panel .
WHAT IS SHORT CIRCUIT STRENGTH OF 100 AMPS MCCB?
HOW TO CALCULATE THE VT SIZING?
I want formula to calculate current loss with distance in km.I searched many sites but didn't right answer.Plz reply me
Name two types of electrical analogous for mechanical system.
What will be in Mahagenco Trade Test Exam? I want to know the same.
Whether power factor should be high or low? Why?
What are the applications of different multistage amplifiers?Plz also write advantages of these amplifiers? Thaaaaaaaaanx
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
Which is the largest hydropower station in the world?