vignesh kumar


{ City } ta,mil nadu
< Country > india
* Profession * instrument engineer
User No # 35532
Total Questions Posted # 1
Total Answers Posted # 8

Total Answers Posted for My Questions # 0
Total Views for My Questions # 1491

Users Marked my Answers as Correct # 72
Users Marked my Answers as Wrong # 13
Questions / { vignesh kumar }
Questions Answers Category Views Company eMail

Sir , i have completed my M.Sc In Instrumentation and presently working in Maintenance department 3 yrs Exp , is there is any possible for work in offshore ..

Instrumentation 1491




Answers / { vignesh kumar }

Question { 5886 }

What should be the stanchan Height for installation of
Smoke detector & toxic gas detector in field,according to
qatar standard


Answer

Height Factor should not be considered for Installing detectors both Smoke Detectors and Toxic Gas Detectors.

And there is no standards for countries such as qatar.america.

The concept is where the emission exists of gas leak or smoke,

while installation we have to be aware of Future preventive Maintenace. The Installation should be such it has to sense the existience of gas and it should be suitable place for calibration,preventive maintenance,and for corrective maintenance.

Is This Answer Correct ?    3 Yes 0 No

Question { 25832 }

Why went


Answer

Vent goes up.
Drain goes down..
Vent is generally for removal of air bubbles & Non condensable gases & drain to remove condensates like in pneumatic air,liquids

Is This Answer Correct ?    1 Yes 0 No


Question { 43660 }

thermocouple output is AC OR DC??


Answer

its output is mV DC

Is This Answer Correct ?    56 Yes 4 No

Question { Exxon Mobil, 26807 }

what is meant by calibration


Answer

The procedure laid down or checking the absolute values on a measuring instruments is called Calibration .



"திருவையாறு" -
விக்னேஷ் குமார்

Is This Answer Correct ?    6 Yes 4 No

Question { EID Parry, 5549 }

What is PID tunning


Answer

Choosing the proper values for P, I, and D is called "PID Tuning".

Is This Answer Correct ?    0 Yes 4 No

Question { Emco, 10030 }

what is PM/CM/RCM?


Answer

PM: Preventive Maintenance is Routine check up in very clear very planned every 6 months or 3 months and do the routine check up as calibration,testing, servicing.

CM: unexpected error to be rectified.

RCM: is a process to ensure that assets continue to do what their users require in their present operating context.

Is This Answer Correct ?    1 Yes 0 No

Question { 5961 }

Hi all,

I am Mohamed from Algeria, I'm a senior Technician
qualified in instrumentation. I work in an international
petroleum and gas company (SONATRACH: Separation of
associated gas from crude oil. Production of condensate,
LPG and re-injection of dry gas) within the regulation &
Control instrumentation department.I am interested for
working in Qatar Petrochemical Company (QAPCO) in
Qatar.Now,I am seeking a position, which is an
opportunity for me to put my experience to good use and
actually participate in running on this company.

So, Can anyone help how to contact this company?

Thanks

Mohamed,
mahad8331@gmail.com


Answer

Dear Friend !

Salam walakium.. it s easy to make your resume to qatar petroleum . please apply in the qatar petroleum website usually opens with interenet explorer not other from mozilla or google chrome.

Is This Answer Correct ?    1 Yes 0 No

Question { Gujarat Borosil, 10567 }

What is Trim?


Answer

Valve's trim is a collective name for the replaceable parts, in a valve. A typically Trim design includes a disk, seat, stem, and sleeves needed to guide the stem.

A valve's performance is determined by the disk and seat interface and the relation of the disk position to the seat. Because of the trim, basic motions and flow control are possible. In rotational motion trim designs, the disk slides closely past the seat to produce a change in flow opening. In linear motion trim designs, the disk lifts perpendicularly away from the seat so that an annular orifice appears.

Is This Answer Correct ?    4 Yes 1 No