sneha


{ City }
< Country > india
* Profession * softwaretestengineer
User No # 12501
Total Questions Posted # 4
Total Answers Posted # 31

Total Answers Posted for My Questions # 12
Total Views for My Questions # 23597

Users Marked my Answers as Correct # 166
Users Marked my Answers as Wrong # 85
Answers / { sneha }

Question { 6937 }

WHAT IS ROLE OF TESTER IN TEST PLANNING?


Answer

Tester will not involve in writting a test plan.

Is This Answer Correct ?    4 Yes 0 No

Question { Wipro, 13245 }

What is the role of good test engineer?


Answer

Test Engineer should have the ability to break the
application.

Is This Answer Correct ?    7 Yes 1 No


Question { Satyam, 36138 }

1)what is the basic diff. between unit testing and component
testing
2)how do you implement framework in ur project through
automation


Answer

The basic diff is in unit testing the componenta are
replaced with the stubs and drivers wheres in the component
testing these stubs and drivers are replaced with the real
module.

Plz correct me if iam wrong.

Is This Answer Correct ?    11 Yes 20 No

Question { 11557 }

What are the various black box and white box testing techniques?


Answer

BlackBox Testing Techniques are as follows:
1)BoundaryValueAnalysis
2)Equivalence class Partition
3)Error Guesing
4)State Transition Testing
5)Decision table testing
6)Cause Effect Graph.
7)UseCase Testing
whiteBoxTesting Techniques are as follows:
1)Statement coverge testing
2)Loop Testing
3)Branch Coverage Testing

Is This Answer Correct ?    19 Yes 0 No

Question { McAfee, 10932 }

How will you know if you wrote sufficient test cases for a
particular business requirement.


Answer

we map each test case with the requriments.If all the
testcases are mapped with all requriment then we can
confirm tht testcases are sufficient and this process of
mapping the requriment with testcase is what we call as
Traceability Matrix

Is This Answer Correct ?    21 Yes 3 No

Question { GXS, 14692 }

If you have 1000 test cases which takes atleast 4 months
for execution and now project has to be delivered within 2
weeks how will you execute your test cases. Which ones
should be executed first.


Answer

The TestCases which have high priority needs to execute
first.
or we can write a script in automation and we complete with
in a givem time.

Is This Answer Correct ?    1 Yes 0 No

Question { 6037 }

I u dont have SRS doc or dont have any info about product
then how will u test it?


Answer

Then we go for Adhoc testing.....

Is This Answer Correct ?    0 Yes 0 No

Question { Covansys, 10611 }

WHAT ARE THE BUG TOOLS USED IN YOUR COMPANY


Answer

Qulity Center

Is This Answer Correct ?    1 Yes 5 No

Question { 15709 }

which certification we have to complete first?
ISTQB or CSTE? in ISTQB which level i have to choose?
Foundation level or advanced level?
Can any one tell what will be the syllabus and how tough it
will be? pls anyone share the experience


Answer

Hi....if u have 2 yrs of exp in testing then u can go for
CSTE,if u have no exp or less than 2 then u can go for
ISTQB.And in ISTQB u have to complete foundation level
first with out foundation level ur not eligible for
advanced level......and syllabus u can download from the
corresponding sites and ISTQB is not at all tough....u can
do it....ALL THE BEST

Is This Answer Correct ?    16 Yes 1 No

Question { 15709 }

which certification we have to complete first?
ISTQB or CSTE? in ISTQB which level i have to choose?
Foundation level or advanced level?
Can any one tell what will be the syllabus and how tough it
will be? pls anyone share the experience


Answer

U can write CSTE directly there is no rule tht first u have
to complete ISTQB and then only CSTE...both differ from each
other.Since u have 2.7 yrs of exp u can write the
CSTE.....ALL THE BEST

Is This Answer Correct ?    2 Yes 0 No

Question { Value Labs, 8903 }

how u get the build ?what is the size of the biuld?


Answer

Build will be in the form of exe, through mail we will be
informed that build is ready and we can start testing.
Plz correct me if I am wrong.........

Is This Answer Correct ?    2 Yes 3 No

Question { 3237 }

In the team both developers as well as testers will be
included na,if so then the same TL will assign the work for
testers also or else TL will be different for testers?


Answer

Both teams will have different Team Leads...

Is This Answer Correct ?    1 Yes 0 No

Question { 7244 }

What is open issue?please explain in detail?


Answer

The issue which is already known is called open issue.
Plz correct me if i am wrong....
Thanks In Advance

Is This Answer Correct ?    0 Yes 2 No

Question { 15168 }

Hi,
Is there any function or vbscript in QTP to clear the
cookies,sessions. Please help me in this.


Answer

where can i inculde the above script?Do i need to call this
for each and every time when the QTP opens new window?

Is This Answer Correct ?    0 Yes 0 No

Question { 6363 }

How we can test Cookies Manually?


Answer

Yes we can test cookies manualy,,for example if we have the
user login with username and password and a check box which
says do u want to remmber user name and password. In this
case if we enter the user credientials and check the check
box we can able to login. And for the next time we don't
need to enter the credentials.... it will automatically
login....please correct me if iam wrong.

Is This Answer Correct ?    0 Yes 1 No

Prev    1    [2]   3    Next