Client want in billing all the header and item level items should be displayed. We need to configure it. I am testing example of Header Level BOM. Can anyone please suggest the settings behind that. SO what I did In TAE - Billing relevancy I set as A and Stats as Y. We did no changes in TAQ. I checked it was not working, then I went back to VOV7 and in TAE in item type is- B which means text items I removed that and made it as standard, now both in delivery and billing all the items are visible and billing is only taking the price of TAQ that is the main item. Is is the right way or am i following something wrong procedure and needs to change something. Now if the item type is B- text item material is not available in delivery and if I will enter as blank material will be available in delivery but picking can be done.
1 3927We select 10mm nominal thickness for Elip head of a pressure vesel. The minimum thickness after forming is 8.2mm. (Shell thickness is 8mm. The minimum thickness after forming is satisfied or not with UG-79 (d)(3) in ASME SECTION VIII, Div.1?
2602Sequence Number in a TCP header is used for (list all that apply) a. acknowledgements b. upper layer information c. reordering of the octets received d. protocol dependent information e. rejecting the duplicate octates
1 23664 parts of UDP header: a. source IP b. destination IP c. source port d. destination port e. length f. UDP checksum
1 2666You are in a marketing company. you reporting manager came from head quarters to your region. There is time for him to visit only one customer. If there are three customers, out of which one is existing customer and he had no issues with company. second one is also existing customer but having service issues. Third one is not customer but we can try to make him customer too. which customer has to be visited along with your superioe ?
1 3373
Juxtapose the HTTP verbs GET and POST. What is HEAD?
How would you attach pictures in column headers of List View Control?
Can a meta tag be used to set the Expires header?
What is the syntax of the Expires header and how to set it?
What does the error Too many ``Received'' headers - suspected mail loop mean?
Describe a finite state machine that will detect three consecutive coin tosses (of one coin) that results in heads.
How to use the Find Error entry under the search heading of the menu bar?
How would you attach pictures in column headers of List View Control?
How would you add column headers in listview control?
what is be the overhead, if i use binary transmission. and will it be sent using xml text or how ?
I am stuck up with a question on appending of two arrays
I am writing the code for the same, I am appending two
strings this way
int main()
{
string s1 = "Welcome to C++";
string s2 = "C++ improves the logic ability";
string s3 = s1 + s2;
cout< I am a newbie to QTP / Automation testing. I want to
develop a script that creates a data file automatically
with proper headings using VBScript in QTP. hi this is seenu from hyderabad. i hav completed mba
(distence).buy i after tht i did pgdca and .net course
after tht i joined job as a software engineer .now i got
h1b visa appointment in chennai octo 30th now i hav exp two
years only but i put four years exp as a software
engineer .now i got job as a program analyst same company
head office in usa . my employeer only suggestme like put
four years exp like tht . this is my profile plz can anyone
can tell which questions they ill ask and give me
suggections . I have a requirement from the SD people wherein whenver one
runs the tcode F-02 (Enter G/L account Policy : Header
Data), they should not get the list of all acounts in the
ACCOUNT field. But when i go to pfcg to check for
restricting the list, i dont find any pertinet auth field
for doing so. Isi t something that we can ( as Basis Admin)
do or the ABAPpers to do. Maybe the ABAPpers have to
program the screen where in they need to restrict the list
options. If not so, lemme know the auth field that has to
bet set if any. Assignment
A software house got a project to automate sales/purchase
department of a furniture store. The store management is
clearly transferred their requirements to the software
house management. There is no chance of changing the
requirements afterwards.
Software house management use waterfall process model to
make the project.
Given is the progress flow of water-fall process model
In waterfall process model, the deliverable (document)
produced in one phase serves as an input to the next
phase.
Suppose you are a project manager who is leading this
project. It is decided to work and complete the project
using waterfall process model approach. You are required to
develop a plan in which the key task is to decide the
deliverable that should be built during and after
completion of each phase. Also give a description or
required contents that must be included in those
deliverables.
You are not supposed to make the complete project. All you
are required to do is to make a Project plan. In that, you
need to give a set of deliverables (documents) which
according to you, should be developed in each of the phase
(Requirements, Designing, implementation, Testing,
Maintenance). Also provide contents which should be there
in each deliverable. The contents should be clear and have
brief explanation.
Note:: There are one folder and one file in the attached
folder. The file is named as Assignment 4 write-up which is
your assignment write-up. The other folder named Project
deliverables is the folder in which you are required to
organize and place your deliverables. Name of the
document/deliverable saved in each folder should be
mentioned in the file named checklist (This file is placed
in the “Project deliverables” folder)
For Example
If you produce a deliverable named Requirement
Specification (RS) in the “Requirements” phase. You need to
do following tasks
1) Finalize the RS contents
2) Save the file in sub-folder named Requirements
3) Write the name of this document in the checklist
file under the heading Requirements.
Similarly, you need to make and save deliverables of each
phase. Not all phases contain one deliverable. There must
be some phases having more than one deliverables.
PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ?
CHECKLIST ARE:
1-Requirements
2- Designing
3- Implementation
4- Testing
5- Maintenance