How often you do the load test in your current project?

Answers were Sorted based on User's Feedback



How often you do the load test in your current project?..

Answer / ravi v v

This also depends on the Project / application demand.

For Example if the application is like depends on the Data
that is going to change every day with heavy fluctuations.
Then we will keep certain time period (say 30 days) we will
test the LOAD during these 30 days on every day to moniter
the performance behaviour of the application.

Is This Answer Correct ?    2 Yes 0 No

How often you do the load test in your current project?..

Answer / guru

Hi,

Load Test is ideally done only once, and only after all
the Functional Testing (UAT/SIT).

Otherwise, i could depend on your client requirement.

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Load Runner Interview Questions

How you enhance the basic script?

0 Answers  


How to create a scenario?

0 Answers  


IS THERE ANY INSTITUTE PROVIDING LIVE MONITORING & ANALASYS

3 Answers  


where we can insert the defects in load runner?

1 Answers  


how can i capture the elapsed time of a scenario in a script?

1 Answers  






What is a difference between pacing and think time?

0 Answers  


You have an application which shows the exam results of the student. Corresponding to name of each student its mentioned whether he passed or failed the exam with the label of “pass” and “fail”. How will you identify the number of passed and failed student in vugen script?

0 Answers  


What is memory Leak. What is the most suitable performance counter to detect Memory Leak.

5 Answers  


How many types of scripts generated in LoadRunner?What are they?

6 Answers   Liquid Crystal,


Where should you add a web_reg_save_param function to a script?

0 Answers  


How do you identify which values need to be correlated in the script? Give an example.

0 Answers  


what do u mean by co-relation?

11 Answers   3i Infotech, Punj Lloyd Ltd,


Categories