How often you do the load test in your current project?
Answer Posted / ravi v v
This also depends on the Project / application demand.
For Example if the application is like depends on the Data
that is going to change every day with heavy fluctuations.
Then we will keep certain time period (say 30 days) we will
test the LOAD during these 30 days on every day to moniter
the performance behaviour of the application.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How we tested remote servers if client is installed in another place
How to record the desktop application in Loadrunner 12.53 version 64 bit window.
How you edit the script?
What is local configuration file?
What do you mean by creating vuser script?
How to create a host list for a scenario?
What is report viewer?
How you develop the database vuser script?
When a scenario run exactly what happened?
What are all the components of loadrunner?
How do you load a load runner agent?
How vugen create a vuser script?
I have one Scenario login then bookcoffee then logout explain test plan for above scenario?
When the loadrunner controller open the winrunner file then what is the location of the winner configuration file?
Hi all, I am having an interview on LoadRunner (SAP Web Protocol). I am wondering if somebody can help me with some interview questions at a 2 yr Scriptor level. Thanks and all answers are much appreciated.