How often you do the load test in your current project?
Answer Posted / ravi v v
This also depends on the Project / application demand.
For Example if the application is like depends on the Data
that is going to change every day with heavy fluctuations.
Then we will keep certain time period (say 30 days) we will
test the LOAD during these 30 days on every day to moniter
the performance behaviour of the application.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the purpose of a loadrunner transaction?
What kind of problem can we face regarding hardware, software, network and memory bottleneck during the performance test?
What is the difference between hits/second and requests/second?
What are the challenges that you will face to script the step “select all” and then “delete” for any mail account?
How to find get the Response time of the Online News Feeds (News headlines getting updated in every second with out any user intervention)using Load Runner ?
You have created several auto-correlation rules. A new tester on your team is preparing to record a group of scripts on the same application on his workstation. What can you do to provide the tester with the correlation rules?
What is x-windows?
What is the vuser in the scenario?
How you develop the database vuser script?
What is rendezvous graph?
During the load test, what is the optimum setting for logs?
What is parameterization & why is parameterization necessary in the script?
What the vuser script contain?
What is run-time-setting?
When the loadrunner controller open the winrunner file then what is the location of the winner configuration file?