How often you do the load test in your current project?

Answer Posted / ravi v v

This also depends on the Project / application demand.

For Example if the application is like depends on the Data
that is going to change every day with heavy fluctuations.
Then we will keep certain time period (say 30 days) we will
test the LOAD during these 30 days on every day to moniter
the performance behaviour of the application.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How we tested remote servers if client is installed in another place

1946


How to record the desktop application in Loadrunner 12.53 version 64 bit window.

1911


How you edit the script?

818


What is local configuration file?

779


What do you mean by creating vuser script?

833


How to create a host list for a scenario?

897


What is report viewer?

880


How you develop the database vuser script?

880


When a scenario run exactly what happened?

845


What are all the components of loadrunner?

695


How do you load a load runner agent?

878


How vugen create a vuser script?

804


I have one Scenario login then bookcoffee then logout explain test plan for above scenario?

1737


When the loadrunner controller open the winrunner file then what is the location of the winner configuration file?

842


Hi all, I am having an interview on LoadRunner (SAP Web Protocol). I am wondering if somebody can help me with some interview questions at a 2 yr Scriptor level. Thanks and all answers are much appreciated.

6513