Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


1.Test of Reasoning 2. Numerical ability 3.Test of english
Knowledge 4. Time & Distance 5. Coding & decoding Test


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More General Aptitude Interview Questions

pls send me ford's aptitude,technical and HR questions to my id pavim88@gmail.com,its very urgent

1 Answers  


Three independent mechanisms A, B and C have been incorporated for power saving in a plant producing respectively 30%, 40% and 10% efficiency. Assuming that they operate independently, what is the net power efficiency achieved

0 Answers  


An article costs rs. 950 and is sold at a profit of 10%. another article of the same type is sold for the same price but at a loss of 5% what is the sum of the cost prices of both the articles?

5 Answers  


Dear sir,i'm siva.i have applied for rrb ASM.please send last 5 years Aptitude Question paper with answers.thanks.regards siva.

0 Answers  


1. A plane travels 695km with wind and 498km aginst the wind in same time.The speed of wind is 21km/hr. Find the speed of plane?

5 Answers   Satyam, TCS,


A telephone cable is to be run from a junction point on the bank of a river 900 meters wide to an office that is located 3000 meters downstream on the opposite bank. If the cost of laying cable under water is Rs. 5 per meter and that of laying overhead on land is Rs. 4 per meter, find the point downstream where the cable is to cut across the river. (a) 450 (b) 1800 (c) 2800 (d) 2100 (e) 2700

7 Answers   TCS,


Find sum of 3 + 5/(1+22) + 7/(1 + 22 + 32) + ......

0 Answers   Flipkart, Wipro,


A square plot of some size , at four corners equal squares of some size are cut and is formed as open box. If this open box carries 128ml of oil. What is the size of the plate i.e. side a.17 b.14 c.13 d.none

8 Answers   IBM,


Two coins one with HEAD IN BOTH SIDES and the other coin HEAD IN ONE SIDE AND TAIL IN THE OTHER SIDE is in a box,a coin is taken at random and FOUND HEAD IN ONE SIDE .what is the probability that THE OTHER SIDE IS HEAD?

0 Answers   Accenture,


A power unit is there by the bank of the river of 900 mtr width. a cable is made from power unit to power a plant opposite to that of the river and 3000 mtr away from the power unit. The cost of the cable bellows water Rs5 / mtr and cost of cable on the bank is Rs 4/ mtr. Find the total of laying the cable.

6 Answers   CTS, LIC, TCS,


two persons run a race of 100m. the winner won by (110/11)m and one second in time. find the speed of lsoer in met

0 Answers   DSQ Software,


In a square, all the mid points are joined. The inner square is shaded.If the area of the square is A, what is the area of the shaded area?

0 Answers   IBM,


Categories