When a timer is placed in RS Logix 5000 with preset value
less than its scan time it is malfunctioning. i.e., if the
preset is set to 30ms still the timer TT bit is counting
till 150ms(its scan time). Any solution for the problem?

Answers were Sorted based on User's Feedback



When a timer is placed in RS Logix 5000 with preset value less than its scan time it is malfunctio..

Answer / kean barton

I added a periodic task that runs every millisecond. The
main program has a max scan time of 15 millisecond but I can
still use timing down to the millisecond in that routine.
Good luck with it!

Is This Answer Correct ?    2 Yes 0 No

When a timer is placed in RS Logix 5000 with preset value less than its scan time it is malfunctio..

Answer / grajesh

add 5 timers in series

Is This Answer Correct ?    3 Yes 2 No

Post New Answer

More Instrumentation Interview Questions

what is o2 analyzer and how it measured ,what is the role of this analyzer in cfbc boiler...

0 Answers   Mittal Steel,


why two probes are used in turbine flowmeters?

2 Answers  


why use MMWC unit

9 Answers   Praxair, Saipem,


hello.my friends.i am an electronics & instrumentation engineer.i want to know Q1.why lugs use in instrumentation cable termination? Q2.if limit switch not working what to do?

2 Answers  


What are the interlocks we have to check during the start up of LP/HP compressor?

0 Answers   Hamsco,






what is the difference between Cv and air consumption? why the customer needs Air consumption details?

0 Answers  


1)how we calculate the drum level? and how we select the transmitter range?

3 Answers  


what is the output of conductivity sensor and PH sensor?

3 Answers  


what is the electrical operation procedure for switching on 27.6MVA electric furnace.

0 Answers   Jindal,


What is expansion of SMART Instruments? And What is it?

35 Answers   Atesco,


If Solenoidal valve works in manual mode but not in Auto mode. What should be the problem?

8 Answers   Bharathi Cement, Titanium,


During the design and engineering of a process plant, a good designer should plan for ____________, ___________ and ____________ aspects of the plant

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)