Volcano : Lava ::
A.) water:swim
B.) tunnel:dig
C.) crack:wall
D.) Fault:earthquate
Answers were Sorted based on User's Feedback
Answer / summi
if volcano occurs then lava results
similarly if u have water then u can swim
Is This Answer Correct ? | 0 Yes | 0 No |
This is on letter series like if DEFGHI: ABCDEF then NOPQRS:_______
11 Answers EA Electronic Arts, TS,
During a given week A programmer spends 1/4 of his time preparing flow chart, 3/8 of his time coding and the rest of the time in debugging the programs. If he works 48 hours during the week , how many hours did he spend debugging the program.
The ratio of no. of boys & girls in a school is 3:2 Out of these what % the boys & 25% of girls are scholarship holders. % of students who are not scholarship holders.?
rita bought dress at 3000 sold it to sita for 25 % profit, sita didnt like it sold it back to rita for 10 % loss. wat % of profit rita got during the transaction ?
how to manage our emotionals?
Mr. Jaweri decided to walk down the escalator on the station. He found that if he walks down 26 steps, he requires 30 seconds to reach the bottom. However, if he steps down 34 stairs he would only require 18 seconds to get to the bottom. If the time is measured from the moment the top step begins to descend to the time he steps off the last step at the bottom, find out the height of the stair way in steps?
meaning of garnet
3 Answers Kumaran Systems, L&T, TAFE,
Please send me the name and no. of post for each place for the post of 20,000 clerks. MY interview was going on 18.10.2008. So please give me a proper response. It's too urgent. MY EMAIL ID is deepgsan@yahoo.com or sandythegreat1986@gmail.com or san.deep53@rediffmail.com
0 Answers State Bank Of India SBI,
pls send me US TECNOLOGYS placement papers.
c=a/b ; a-1=c What is the relation between a&b
Find the 8th term in series: 2, 2, 12, 12, 30, 30, - - - - -
Three men A, B, C can complete a work separately in some specified days (May be 8, 7, 6).If they do the work together by alternate days. Then how many days need to complete the work?