Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


WHICH TYPE OF DOCUMENTS REQUIRED FOR Q.A.& Q.C

Answers were Sorted based on User's Feedback



WHICH TYPE OF DOCUMENTS REQUIRED FOR Q.A.& Q.C..

Answer / prabhat kartikey , me, iem, sg

Q.A- AQL, INSPECTION SHEET, QC,ETC

Q.C- X BAR RANGE CHARTE , cASE OF VARUATION, PRODUCER RISK
LEVEL, CONSUMER RISK LEVEL

Is This Answer Correct ?    5 Yes 1 No

WHICH TYPE OF DOCUMENTS REQUIRED FOR Q.A.& Q.C..

Answer / vijayan

QA - Quality Assurance (To assure the quality )
For Eg:Procedures for assuring the quality

QC - Quality Control (To control the quality)
For Eg:Calibration of instruments sheet

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More Industrial Engineering Interview Questions

what is fixed bearing?

0 Answers  


Hoe electronic energy meter works?

0 Answers  


what is the power supply of 4 wire transmitter?

0 Answers  


how do you check pump impeller front clearance?

0 Answers  


I have got an interview for a higher apprenticeship at JCB next week, the interview process consists of group and solo tasks, and group and solo interviews. Has anyone got any information in what I should expect on the day, or the frequently asked questions so I can get a head start.

0 Answers   JCB,


What is vendor development? What is the logistics transport control?

0 Answers  


What is the specification of transformer?

0 Answers  


Can any One Help me to Know about Fire hydrant and its related water Pressures

0 Answers   Matrix,


What is setup time?

0 Answers  


How the costs of the products and throughput time can be reduced while handling materials?

0 Answers  


How to calculate the CFM to TR? What is the Formula

1 Answers  


What is quality management system? Weather qms is suitable, adequate and effective or not? Is there any quality policy? Is there any quality objective? If yes, then what are they? How they are planning to achieve quality objectives? Do they are measure quality objectives?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)