please tell me any easy ways of testing the Data warehouse
project. In my project we are not using any tools for ETL.
we are writing scripts in SCRIPTELLA.
And we using Pentaho tool for Reporting
How can i test all these. please tell me ASAP.
thanks in adavance
No Answer is Posted For this Question
Be the First to Post Answer
what are the reporting tools and difference between them?
tell me few points when u become TL
how to load the data to fact table?
we hava a flat file having more than 1000 records and two targets. i have to write first half of the rows into first targets and next half of rows into second target. how can i do in informetica??
What are the ETL Testing Operations?
Can u access a repository created in previous version of Informatica?
State the differences between shortcut and reusable transformation
what are Lookup caches options? Including persistent caches.
What are snapshots?
Hi Guys, my requirement is to load 1 yr data from oracle to teradata database through abinitio etl graph.i need to schedule this as a monthly job.but i want to load 12 month data for the first time and from second time it should load last (recent) month data and delete 13th month data. For example For the first time it should load 201208 to 201108 data, second time it should delete 201108 month data and load 201209 month data. I developed garph to load 12 month data ,but i don't know how to handle above requirement as am new to abinitio. i greatly appreciate you help.Thank You.
How we can see table structure?
Can anyone please send me the latest informatica dumps (power center 8.1.1) for all the three exams? My mail id is yokilamai@gmail.com