i have 4 systems 1-windows,1-unix,1-linux,1-solaris. 100
vusers to 25 vusers each system. script was created in
windows system. then i want to know how can i do this, do i
need to install LR in all the systems ? please explain
whole the scenario up to...Run step by step---plz give
answer only realtime...?
Answers were Sorted based on User's Feedback
Answer / geeta parate
No need to in install LR on all the systems.
On window machine divide the 100 users to run on different
other machines...it will ask you to mention the name of
those machines. u have to take care that other machines
should be in same network.
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / hp
Thank you for your reply...
do i need to install contorller...on remote systems?
and one more..
we have Unix monitors in LR by default. if i want Linux and
Solaris monitors....what i do..
unix is working for Linux and solaris?
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / geeta
No need o install controller in remote machines...
secondly if your machine i s having Unix then also the all
other machines should be in the same networks thats all
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rekha s
I could not understand this..where can we divide 100
users?? do you mean load generator????
then what is Load generator? LG is a host machine. how an
host machine become a LG? we have to install controller on
the machine then only it becomes LG right? Correct me if I
am wrong...
My question is if you mean divide the vusers for each
machine (os), then we have to install controller on that
machines right??
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / krish
i want to share something here.. If you are working for web application, you must configure other machines to work as load generators. If you are working on client-server application you need to install the application on all other machines too.
| Is This Answer Correct ? | 0 Yes | 1 No |
In Real time what should be the duration(30 min,1 hr) of the loadtest? In the controller how do we handle errors and failed transactions.....When the transactions fail, do we perform the loadtest again? Can anyone please help?
when i run start senario for different process it always completed at elapsed time 6.32 sec. i don't understand why it happens.. can we set elapsed time ? plz answer.... pratik196@gmail.com
What is correlation? Explain the difference between automatic correlation and manual correlation?
What is the difference between overlay graph and correlate graph?
What is wasted time in vugen replay log?
In which scenario, we should use "Vuser as Process" rather than "Vuser as thread" and what is benefit in this case?
HI Any one can say the how to use the loadrunner to test the application. How to write the test scenarios & test cases.
How is vugen script modified after recording?
WHAT IS THE DIFFERENCE BETWEEN MANUAL CORRELATION AND AUTOMATION CORRELATIONS?
What are the documents your using ,and how your distibute the users
If it is possible to test 5000 vuser through single machine? Then how you can test? plz explain
What is synchronization point ?