How can we save the tests Executed in test lab?
Answers were Sorted based on User's Feedback
Answer / malarvizhi
By exporting the reports in excel,xml, word we can save the
tests
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / bakelal
we can select the test which we want to save right click on
it.click on save as, then save it in any format like
excel, word, xml etc.
| Is This Answer Correct ? | 1 Yes | 1 No |
What r the views in testdirector?
When a new defect is logged, what setting should be used to configure QC to send an auto generated mail to the concerned developer?
can we connect qtp 8.2 version with test director 8.0 verion if how if not why 2)when test director 8.0 version released
-QAINSPECT Difference between WEBINSPECT and WINRUNNER/TEST DIRECTOR?
What is the use of the Test Director software?
can anyone provide the reading material for it it would be very helpful thankx in advance my id is svit00ef27@yahoo.com
What do you mean by Requirment Coverage?
I am using Quality Center 9.2. While raising a defect i can see that there is only option to send a mail to assigned and it is also sent to me. Is there any way i can send the mail to multiple users ? I know i can save the defect and than later sent it to multiple users, but is there any way where i can send it at the time of raising the defect itself. Any configuration that can be done by an adminstrator?
What r the views in testdirector?
how to create custom macros on a word document to import into Quality Center.
which is the latest versions of winrunner ,qtp, test director companies now using in real time?
What are Test Beds?