.What is Traceability matrix and how it is done ?
Answers were Sorted based on User's Feedback
Answer / prasad
Traceability matrix that we create depends on test methods
that we follow
In my company it is like a mapping beween the test cases
written from FSD and BRD's
we create a 1*1 matrix between the list of points ponited in
FSD/BRD and the test cases written by us,that's it.
| Is This Answer Correct ? | 2 Yes | 3 No |
Answer / rudraneel
RTM :
This is done to map Requirements along with Test
cases.Before executing Test Cases it's necessary to do RTM.
Example :
Unique No|Requirements|Source of
Requirements|SRS/Functional Doc.|Design Spec.|Program
Mod|Test Case|Changes|Remarks
(this are the parts of RTM specified in Test Approach
Document)
| Is This Answer Correct ? | 2 Yes | 3 No |
what is baseline in testing
Can anybody explain me branch/decision coverage with a example.
What do u do if the bug that u found is not accepted by the developer and hez saying its not reproducable.Note:The developer is in the onsite location
What is the difference between Sanity and Smoke Testing? With Example.
what is the diff between testing and debugging
Who will repare SRS? What is the basis for SRS preparation?
Can you please explain about the erp project
What parameters are you testing for as a Systems Tester ?
Can any one tell me the contents in Traceability Matrix
as a test eng, tell me ur challenges? aug 6. plz answer
Hello Friends someone can help in giving best institute with address to do testing course please. I heard Mr. Nageswara Rao is best. Can some one give his complete contact details please.
what is cyclomatic complexity ?