What is maximum No of Vusers that we can load using
LoadRunner8.0 and how should we connect to database using
loadrunner

Answers were Sorted based on User's Feedback



What is maximum No of Vusers that we can load using LoadRunner8.0 and how should we connect to dat..

Answer / msr

it depends on LR licence.In trail version we can use 25
user licence.In trail version controller will work only 10
days.

Is This Answer Correct ?    5 Yes 0 No

What is maximum No of Vusers that we can load using LoadRunner8.0 and how should we connect to dat..

Answer / guest

the max no user depends on the licences of controller

we can connect to database from controller or using
sitescope


for sqlserver u cant directly connect but orcale you u need
to have sitescope.

Is This Answer Correct ?    3 Yes 0 No

What is maximum No of Vusers that we can load using LoadRunner8.0 and how should we connect to dat..

Answer / rock

this depends upon the license you purchase.Actually the
license of load runner is in the controller which you need
to buy.
thanks

Is This Answer Correct ?    1 Yes 0 No

What is maximum No of Vusers that we can load using LoadRunner8.0 and how should we connect to dat..

Answer / satish

Default u can test upto 25 Vuser at time

Is This Answer Correct ?    2 Yes 2 No

Post New Answer

More Load Runner Interview Questions

What is the difference between HTTP and HTTPS.in Load Runner. And how will u know(Client)ur using HTTP or HTTPS.? Any one can justify?

1 Answers  


Which is the best institute to learn Performance testing with real time project in hyderabad?

6 Answers  


What are the components of LoadRunner?

5 Answers  


WHAT IS SOAK TESTING IN LOAD RUNNER

5 Answers   Virtusa,


i dnt kw loadrunner but i want kw.plz can any 1 help me

1 Answers  






which kind of database counters we use to check the performance of the software and where we can check them?

1 Answers  


suppose in ur company one new project is came for testing applictaion.. duration 1 year.. so,with in one week manual tester role starts and qtp(any) testers role starts..and others role starts,,,,BUT WHEN THE PERFORMANCE TESTER ROLE STARTS... in the midle of the project or ending of the project..and how many months it takes to starts the load runner tester role begins?

1 Answers  


I need to perform a 4hr test run in performance center 9.0 there i need to rampup 10 users after 1 hour. I selected the run tab and added users to down state -> Ready state-> initialise-> Run state. 10 users ramped up successfully for the next 1 iteration only after that the 10 users automatically goes to the stop status. But i want the ramped up users to be carried out for the next 3 hours. Please help me out how to do the rampup successfully for the remaining time period.

1 Answers  


How do we write a user-defined function in loadrunner?

1 Answers  


What is Latency and Bandwidth

1 Answers   HP,


I need to have a price list for HP loadRunner tool (Analysis, Controller, VU generator) for different number of VU (for example 100 VU,200Vu ,500VU) for performing stress testing. and if there is any mandatory support fees or anything related. i know that companies might get discounts but i need the standard price list as i am planning to purchase the loadrunner but i need to know the price list before ,which will be very helpful if anybody can help. //Hint I need the protocol which contains Oracle web application and Siebel-web i think which is Oracle E-business protocol Thanks

1 Answers  


What are monitors?

0 Answers  


Categories