what is mean BVT and BAT?
difference between BVT and BAT



what is mean BVT and BAT? difference between BVT and BAT..

Answer / loadtool.blogspot.com

As per me BAT and BVT are same.BVT stands for Build verification test and BAT stands for Build acceptance test. Once dev team is ready to release new build for testing Build Verification team or owner run some kind of tests to make sure build is stable for further testing.once build verification is passed it can handover to testing team for further testing .If BVT is successful then we can call it as BAT also.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Load Runner Interview Questions

Recognize why and when to use verification?

1 Answers   AppLabs,


How many types of scripts generated in LoadRunner?What are they?

6 Answers   Liquid Crystal,


What is Standard deviation? How it will use in Lr?

0 Answers   HP,


What is the difference between standard log and extended log?

4 Answers  


what is built monitors and they are explain plz?

2 Answers   iGate,






When loadrunner is used?

0 Answers  


If u find Bottle Neck u r forward to Developer or Network Team or Database Team Wat ever may be They r fixing that bottleneck or not If they r fix that Wat they Fix? Tell me if any Experience person I would be thankful to u

1 Answers   Tech Mahindra,


What are Main Differences Between Loadrunner 8.1 and Loadrunner 9.0

2 Answers   CTS, Satyam,


on what monitoring tools have u worked on?

1 Answers   Accenture,


What is The Main Difference Between Http and Https

4 Answers   CTC,


laod runner user guide ?

3 Answers  


How load runner interacts with the application?

0 Answers  


Categories