hi, im rahul
i working on project BUSINESS PROJECT REENGINEERING,IM
DOING MY PRODUCTION ENGG & BPR IS MY FINAL YEAR PROJECTS,
HOW CAN DO MY PROJECTS?
I KNOW NX3,CATIA,PRO-E SOFTWARES (MODELING SOFTWARES)
No Answer is Posted For this Question
Be the First to Post Answer
Types & function of Boiler ?
What are the methods of heat transferin boiler & condenser
what are the measuring instrument used to measure Radial and axial clearances of the gas turbine?
Define a turboprop engine?
How to find rating of Chiller a.c. plant i.e. how to calculate the a.c. load of an area, feeded by Chiller ?
twist drill angle
Explain the difference between the flight of a plane and a helicopter?
What is a purpose of slow firing before commissioning of bagasse based boiler. and what is the water requirement for make up?
what is the difference between BSP, BSW, NPT & G Threads. How can I identify them from a given component.
RRB exam model questions pls forward.
What is blower? Partlist of blower.
what is scavenging? compare diffrent types of scavenging with the relatives marits and limitations?compare the performance of different types of scavenging methods?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)