at what level u prepared the reports in cognos???? in
dataware housing what is the automation tool u r using???
Answer / sandeep8000861
I am not sure the question is correct or giving any context.
| Is This Answer Correct ? | 2 Yes | 0 No |
can we join 2 different queries? One has 10 columns and other has 5+ columns?
hi guys, i think this would be a simple question but i was asked. what is total time taken to develop a report from getting requirement document from the client? dont reply as it depends,i am expecting something else.
I have a value prompt in my prompt page.Now if I set the filter to required then I have to select a value from the list and I will get the respective data in the report page.But If I select nothing then I will get the complete data in the report page. I want that if I select nothing from the prompt list then nothing is displayed in my report page. How should I do this?
How to create Events?
Give me some examples for Lifecycle reporting,i mean which lifecycle we will use for reporting
If you need latest cognos certification dumps to get certified in first attempt with 100% score, please e-mail to getmecert@yahoo.com
Hi..I have COG-112(Report Author),COG-122(Admin),COG-132(Meta data modelling). I took test end of Sep '09.I got 100% wcore with these dumps. If any body need then mail me on kris.bi121@gmail.com
Synchroness 1.What are hash prompts? Ans: Tree prompts in which hierarchies can be seen,they can be said as hash prompts. 2.User wants to see 5 more coloums in the report.We have package and data base,how will u implement using it in report.? Ans: 3.What is automatic optimization?what is optimization?what are the properties you set for optimization in report studio? 4.what is command to display first 10 records from a table? IGATE 1.In FM if we change a fact symbol to attribute,will it effect the report? 2.If a report is slow in generating output. How do u perform tuning? How do u reduce joins in sql? Using left outer join is it going to improve the report performance? IBM 1.How do you configure ? 2.How do you drill through report from RS to Analysis studio?
what is the procedure for scheduling conditional rendering?
What is Render Variable? where u can use?
What errors and types of errors you faced in Cognos ReportNet?
What is defined as data mining?