Hi Guys,
Is it possible to merge and compare graphs from different
scenarios in load runnner ?
Answers were Sorted based on User's Feedback
Answer / nayeem
Merge graph means if u want to see more than one graph in a
single view you can use MERGE GRAPHS
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / bhupendra varshney
Merging of two graphs of the same scenario is possible but
I am not sure whether it will work with different scenarios.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / allin
You can save different graphs in different word documents
and compare.
I am not sure about merging the graphs.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / maheshwar
Yes it is possible to merge and compare graphs
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / maheshwar
This is possible when u mannually design the graphs for
each scenario.
maheshwar_sonu@yahoomail.co.in
919884746314
| Is This Answer Correct ? | 0 Yes | 0 No |
What is the vuser in the scenario?
We add think time between two transaction to give interval between transactions. Why?
What is gui vuser and on which platform it will run?
Specific Performance Monitoring counters for, 1. Web Servers (IIS, Apache etc) 2. Application Servers (Weblogic etc) 3. Database Servers a. Oracle Database b. Sybase c. SQL Server d. DB2
What is a difference between pacing and think time?
What is the advantage of using loadrunner?
How did you plan the Load? What are the Criteria?
How can we develop the database vuser script?
What is remote command launcher?
During the load test, what is the optimum setting for logs?
Which protocols are supported by loadrunner?
What is the threshold level for think time and how can be this changed?