Hi Guys,
Is it possible to merge and compare graphs from different
scenarios in load runnner ?
Answer Posted / bhupendra varshney
Merging of two graphs of the same scenario is possible but
I am not sure whether it will work with different scenarios.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the difference between overlay graph and correlate graph?
You want to have each step in your script measured as a transaction in the controller and not shown in the replay log in vugen. How can you accomplish this?
How many vusers are required for load testing?
During run time where the hosts saves the files?
What is manual correlation?
What is vugen recording and scripting?
How is vugen script modified after recording?
What is performance testing in loadrunner?
Hi all, I am having an interview on LoadRunner (SAP Web Protocol). I am wondering if somebody can help me with some interview questions at a 2 yr Scriptor level. Thanks and all answers are much appreciated.
What is the basic credentials should be provided while recording SAP-GUI?
Suppose ur app server is .net server. In that connection pool is related to memory ?explain how?
How many types of vuser are available?
What is transaction per second graph(pass)?
What is extended log?
How can performance bottlenecks be identified?