Testing actually starts from initial phase
as soon as the BRS is finished testing comes into picture
then BRS review is done
prepare a review report
rectify the doubts from the author of the BRS
understand the requirements
write the test cases
indetify the bugs
report the defects to the doveloper
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / pandu
There is no start diffence between development and testing.
Tester will start work like
Understanding the Requirements. And finding the problems in
requirments.
Preparing test stragy as well test plan and comparing the
design with the requirements.
Preparing test cases and test data as well trasability
matrix.
Finaly testing executing test cases and preparing test
reports upto delevory.
:)
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / bk
Testing starts at the design review meeting b/w dev and
business team. At this point, the tester can clarify any
assumptions he/she might have regarding the Product
Specification Document. Also as the dev and business team
discuss the design, the tester receives input as to how the
end product would function. Thus when the development phase
begins, the tester begins to write the test plan which will
inlcude any specific information gathered during the design
review meeting. Once the test plan is created, the tester
proceeds to write test scenarios/test scripts.
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / anitha bharathan
Testing starts from the requirement phase itself...After
understanding the requirement completely the testers will
start to write the high level scenarios..
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / ramya
Tester will starts the testing when they got the srs and frs
document from Pm's or developers,they will start the testing
with system testing and functional testing.if they find any
bugs then they will post that issues to the developers.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / chitra
Testing starts as soon as the requirements are given.
After verifying requirements,the testers start testing
process,find bugs and report them to the Development team.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sandeep dash
from the begning phase.tester test the application till
er=ar.
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / mohamed kalifathullah
testing is starts in developed in SRS docment, it going on
maintainance phase.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / swathi
Testing is started from initial phase to End phase
Example:-
planing
|
Requirement analysis
|
Design
|
code develop
|
Testing
|
Report
|
Release the product
| Is This Answer Correct ? | 0 Yes | 0 No |
1.While doing regression testing one bug raised due to functionality dependency, what is the bug status that one?
After receiving the bug as fixed , what types of tests we will continue...
is smoke testing is perform before realease Product
what is the difference between client,customer and end-user?
in configuration tool as a tester wich documents u r going to add
In a month how many times bugs will be send to your developer. 1 or 2
why do u go for whitebox testing,when black box testing is available?
what is acid testing?
Do you know anything about Set Top Boxes?
In first version of the build i found a bug . I report it to my developers with all the procedures and that was accepted by the developers and the bug was in open state. In the next version of the build the bug was not able to reporduce it .Then wat will be the status of that bug
How do you prepare a regression testing suite?
difference between test bed,test environment,test harness,sanity testing,smoke testing,,retesting ,regression testing (abcd)