what r the key components in a test plan document?
Answers were Sorted based on User's Feedback
Answer / saikrishna reddy.k
following are thekey components in test plan
1.introduction
2.scope&objective
3.testplan id
4.list of features
4.1features to tested
4.2features not to tested
5.test approach
6.test environment
7.entry criteria
8.suspention criteria
9.exit criteria
10.test deliverables
11.staffing needs
12.roles and resposibilities
13.training needs
14.communication & status reporting
15.schudule
16.approvals
if any thing is more pls give me feed back.
thank you.
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / suneel reddy
key components are
The extent to which
features tobe tested
features not to be tested
Feature pass/fail
test envirornment
testing approach
suspension criteria
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / surya
14.communication & status reporting
will not come under Test Plan as per IEEE 829 standard.
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / prajakta
Along with above some others are there
1) Risk
2) Test Schedule
3)Control Procesure like bug Review meeting, change request,
defect reporting.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / prajakta
Along with above some others are there
1) Risk
2) Test Schedule
3)Control Procesure like bug Review meeting, change request,
defect reporting.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / chandru
In addition to the above components the factors like:
1.Unforeseen problems that means we have to guess certain
problems that may arise in client's place.
2.Scheduling and allocation the testing resources
3. HW/SW requirement.
4.In additon to Risks, failures to be identified like HDD
crash, DB recovery, back ups needed in terms of HW/SW and
resources to be planned in advance!
| Is This Answer Correct ? | 0 Yes | 0 No |
Explain what are test driver and test stub and why it is required?
What is Cause and Effect Diagram, how it helps in software testing?.
How can new software qa processes be introduced in an existing organization?
What is Project Planning? how we can do the same? Is there any tool we can use for the same?
List out the software quality practices through the software development cycle?
What are the tests activities that you want to automate in a project?
what is Test senario?
contents of test stratergy?
what is defect life cycle in test director
Interface Testing means?
What is quality audit?
Could anyone share FAQs for QA/QC position.