a sum 's' is devided into 4 parts.second person gets Rs 10
more than first.3rd person is Rs 10 more than second, 4th is
10 more than 3rd. how much amount do 1st person get?

Answers were Sorted based on User's Feedback



a sum 's' is devided into 4 parts.second person gets Rs 10 more than first.3rd person is ..

Answer / mayank

s=a+(a+10)+(a+10+10)+(a+10+10+10)
s=4a+60
a=(s-60)/4

Is This Answer Correct ?    55 Yes 2 No

a sum 's' is devided into 4 parts.second person gets Rs 10 more than first.3rd person is ..

Answer / guest

(s-60)/4

Is This Answer Correct ?    35 Yes 4 No

a sum 's' is devided into 4 parts.second person gets Rs 10 more than first.3rd person is ..

Answer / velmurugan

S=a+(a+10)+(a+10+10)+(a+10+10+10)
S=4a+60
S=4(a+15)
s/4=a+15
a=s/4-15
a=(s-60)/4

Is This Answer Correct ?    19 Yes 2 No

a sum 's' is devided into 4 parts.second person gets Rs 10 more than first.3rd person is ..

Answer / padma lochana bisoyi

1st person gets (s-60)/4

Is This Answer Correct ?    14 Yes 0 No

a sum 's' is devided into 4 parts.second person gets Rs 10 more than first.3rd person is ..

Answer / imthiyazs

P=(S-60)/4

Is This Answer Correct ?    12 Yes 0 No

a sum 's' is devided into 4 parts.second person gets Rs 10 more than first.3rd person is ..

Answer / krishnaveni

let 1st person get 'a'/- say
so 2nd get a+10
3rd get =10+a+10=a+20
similarly 4th get a+30
so total=s
a+a+10+a+20+a+30=s
a=(s-60)/4

Is This Answer Correct ?    10 Yes 0 No

a sum 's' is devided into 4 parts.second person gets Rs 10 more than first.3rd person is ..

Answer / sankar

s=a+(a+10)+(a+10+10)+(a+10+10+10)
s=4a+60
a=(s-60)/4

Is This Answer Correct ?    9 Yes 0 No

a sum 's' is devided into 4 parts.second person gets Rs 10 more than first.3rd person is ..

Answer / vignesh1988i

my mode of answering is :
a,b,c,d are the four persons...

b=10+a;
c=10+b;
d=10+c;

a+b+c+d is the total amount 'S'

then substituing the values in terms of A :
a+10+a+20+a+30+a+40+a
5a will be 100 , so a=20.....

which is a=(s-60)/4 as mentioned above........


thank u

Is This Answer Correct ?    7 Yes 2 No

a sum 's' is devided into 4 parts.second person gets Rs 10 more than first.3rd person is ..

Answer / susithra

10

Is This Answer Correct ?    5 Yes 3 No

a sum 's' is devided into 4 parts.second person gets Rs 10 more than first.3rd person is ..

Answer / susithra

S=x+(x+10)+(x+10+10)+(x+10+10+10)
S=4x+60
S=4(x+15)
s/4=x+15
x=s/4-15
x=(s-60)/4

Is This Answer Correct ?    3 Yes 1 No

Post New Answer

More General Aptitude Interview Questions

please send me Bank Probationary officer exam sample papers that contain all sections

0 Answers  


If two cards are taken one after another without replacing from a pack of 52 cards what is the probability for the two cards be queen.

6 Answers   BFL, Cadence,


A batsman scored 18 runs in his 18th innings and that makes his average 18. Find his average upto the 17th innings?

0 Answers   Hexaware,


A person was fined for exceeding the speed limit by 10 mph. Another person was also fined for exceeding same speed limit by twice the same. If the second person was travelling at a speed of 35 mph, find the speed

0 Answers   TCS,


hi, Can u pls send me the model question paper or previous papers if any,for HPCL information system officer exam and UII exam ? Plz suggest any of the best material or any helpfull links for the preparation of banks and other govt-sectors written tests. Waiting hopefully for your help, Regards sapna.kudari@yahoo.com

0 Answers   HPCL,






Lowest sum of three odd number

1 Answers  


from 1994 to 1995 the sales of a book decreased by 80% if the sales in 1996 were the same as in 1994 by what percent they inrease from 1995 to 1996

4 Answers  


A hollow cube of size 5cm is taken , with the thickness of 1cm . it is made of smaller cubes of size 1cm . if the outer surface of the cube is painted how many faces of the smaller cubes remain unpainted?

8 Answers   Accenture, CTS, TCS,


the largest river of asia is

4 Answers  


BOTH WHICH TEAM IN FINAL IPL 2009 & WHO IS WIN

7 Answers  


The size of a program is N. And the memory occupied by the program is given by M = square root of 100N. If the size of the program is increased by 1% then how much memory now occupied?

0 Answers   Accenture, BSNL,


a bus started from bus stand at 8.00am and after 30min staying at destination it returned back to the bus stand.the destination is 27 miles from the bus stand the speed of the bus 50percent fast speed at what time it returns to the bus stand.

0 Answers   TCS,


Categories