what is the max no of points of intersection of two circles
of unequal radii
Answers were Sorted based on User's Feedback
Answer / subbu
the maximum number of intersection point is equal to the
max(degree of the equation of the curves which are
intersecting). so answer is 2.
Is This Answer Correct ? | 34 Yes | 0 No |
Answer / sapna
The maximum no. point of intersection is 2
Answer is (c)
Is This Answer Correct ? | 6 Yes | 1 No |
Assuming that centres of both the circles are Same.
Is This Answer Correct ? | 6 Yes | 5 No |
Answer / ajay
360 Degree must be the max no of points. Coz 360 degree
makes a complete circle. and both can be intersected to
each other at unequal radii.
Is This Answer Correct ? | 3 Yes | 6 No |
If a and b are positive integers, is a + 4b odd? 1) b is even. 2) a is odd. a) if statement (1) ALONE is sufficient, but statement (2) alone is not sufficient to answer the question. b) if statement (2) ALONE is sufficient, but statement (1) alone is not sufficient to answer the question. c) if BOTH statements (1) and (2) TOGETHER are sufficient to answer the question asked, but NEITHER statement ALONE is sufficient. d) if EACH statement ALONE is sufficient to answer the question asked. e) if statements (1) and (2) TOGETHER are NOT sufficient to answer the question asked, and additional data specific to the problem are needed.
in which state does bay of bengal exist
The Biggest Desert in the world__________
Two sentences are given and we were required to print the common word in the two sentences. Words were delimited by space, full stop, ? , ! and , . The trick in the question was that common word should be printed only once so if ur first sentence contains two word "how" and second contains "how" then in output how should be printed only once for this u can replace each matched word in second sentence by spaces . i want a solution in C/C++ language
A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.
Hi fnds.. I am doing Finar MCA ... I want US TECHNOLOGY RECENT Palcement paper.Can any one help me. velusamy.s@kgisliim.ac.in plz send to this mail id...
George while driving along the highway saw road markers which are at equal distances from each other. He crosses the markers every 20 seconds. If he increases his speed by x meters per second, he crosses the markers at every 15 seconds. But if he increases his speed by y meters per second, he crosses the marker at every 10th second. If y-x = 40 meters per second, then what is the distance between two markers.
---- of a mutual instrument vibrate 6,8 & 12 intervals respectively. If all three vibrate together what is the time interval before all vibrate together again?
pls send all the question papers regarding bank clerical exams on my id arvindk.rathore@yahoo.com
A hollow cube of size 5 cm is taken, with a thickness of 1 cm. It is made of smaller cubes of size 1 cm. If 4 faces of the outer surface of the cube are painted, totally how many faces of the smaller cubes remain unpainted?
what is the next number in the series 3,26,15,124,
if 4 circles of equal radius are drawn with vertices of a square as the centre , the side of the square being 7 cm, find the area of the circles outside the square?