What do you mean by Requirment Coverage?
Answers were Sorted based on User's Feedback
Answer / kiran.a
Requirement Coverage nothing but after perparation of all
Testcases, we map those Testcases with Requirements to check
whether we covered all the Req's in this testcases or not
| Is This Answer Correct ? | 9 Yes | 0 No |
Answer / bibhas
Requirment coverage is nothing but a Process flow matrix,
which keep track of the deliverables.
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / kerasi
requirement coverage means if the software design had all
requirement covered, or if the test plan (testing )covered
allthe software requirements
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / prakash.j
Requirement coverage comes under Functional Coverage
Criteria - Test Development and Optimization
a. Where to Find Requirements
b. Traceability
c. Testability
d. Attributes of Testable Requirements
e. Test Matrix
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / mahapatra
Requirement coverage, is what we write short requirements
in quality centre or test director.
Those has to map with test cases.
In project doc specifications, those requirements has to be
there.
Requirement traceability matrix even can map with quality
centre requirements.
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / bhranti
Requirement Coverage means Tester needs to make sure
Requuirements are attech with test plans.
| Is This Answer Correct ? | 0 Yes | 3 No |
What r the views in testdirector?
What r the views in testdirector?
What is the use of Test Director software?
3 Answers Bank of New York, IBM,
How can we save the tests Executed in test lab?
Hi all, I use the Requirements Traceability and wnat to send by email a Trace Comment. But when I send out the requirement by mail I don’t receive Trace Comment. In place of Trace Comment I do receive the other felts who I didn’t needed For ex. ReqName, ID, Reviewed, Status, Author, Creation Date, Creation Time, Modified But I would rather be with. ReqName, ID, Trace Comment, RFC_status, Priority, Assigned To, Author, Creation Date Above all, I would like to Trace Comments will. Do you have any idea how to change this? And how to recieve Trace Comment?
what was the advantage of Quality center? functions performed using Quality center? thanks in advance
what iz d difference between TD an QC??…….
how will you do execution workflow, creat and modify test sets
which is the latest versions of winrunner ,qtp, test director companies now using in real time?
What are the 3 views?
what is connection between test plan tab and test lab tab? how can u access your test cases in test lab tab?
what are test beds?