What will you do if your developer doesnt agree with you on
the severity and priority that you assigned to a bug
Answers were Sorted based on User's Feedback
Answer / chandra
The Question here is not about the Developer accepting the
defect as a defect or not.. this is about the severity and
priority of the defect not been agreed by the SE..
To answer the question....
As you all know Severity and Priority are two different
measures of a Defect...
S : Technical Measure
P : Business need.... (in other words..Users urgency)
During the kick off.. A set of rules will be defined on
assigning the severity and Priority to the defects...
Severity : 1 - Cannot work further..(technically.. system
crash.. cannot login.. application not available... etc..)
2 - A major portion of the application testing is blocked
due to a failure.. (Say you are checking a reporting tool
which will send out notification email after the report
finish running... and the notification server has issue and
no notification is sent after the report completes running)
3 - Any functional Defect.. (cannot save a record. cannot
process a calculation etc)
4 - minor UI issues or spelling mistakes etc..
5 - suggestions or nice to have things...
on the other hand priority is purely user dependent..
A user can set a priority of a spelling mistake as P1. as
it is important for him.. so SE cannot argue at this
point..
So Defects whose levels are set as per the above
calculations will hardly see a rejection from SE..
If nothing workds .. there is always a DRB or Triage group
which decides the Sev/Pri of a defect..
Hope this answers the question....
Cheers
Chandra
Is This Answer Correct ? | 12 Yes | 0 No |
Answer / aman
If developer does not agree , then I will firstly send the
snap shot to him for consideration of the bug.
If then also there are problem of not accepting then I will
include the senior member and architecture into this.
It will be learning Phase for me as well as the developer in
that case.
Aman
aman.testing@gmail.com
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / prasanna raghava
We will send snap shots of the bugs to the development team
and also we will inform to our Team Lead regarding the issue
and he will take care of it.
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / phani
Hi,
In my view,sevirity is given by TEs and priority is based
on the time to release if release date in near its high far
lowpriority respectivly.
priority is nothing but time taken to fix the bug by
adevolper based
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / ramprasad.s
Hi
Steps & procedures with attachments will be sent to the
developer .
It may not be reprodusable at the developer end
or
The Retested build may again cause bug whild doing
regression Test.
We have send the test scenario wise to the developer.
u got it.
sun_ramprasad@yahoo.com
Is This Answer Correct ? | 0 Yes | 2 No |
Work flow in testing in your company?
hi this is satish can some one help me out by sending the maxium notes on client sesrver ,web server and company architechture project hirearchy and company hirearchy i will happy to recive the answers as early as possible
How Defect prevention can be accomplished ?
What are all the usability guidelines to consider for testing WWW?
what is the difference between softsmith qamonitor and bugzilla?
Wht are the Test cases do we write for Dialog box.. can anybody answer it.. Thanks in advance
difference between test strategy,test plan and test methodology. which will create first and who will create those and is there anyone optional in that
How to write integration test cases? And as a black box tester do we write integrated test cases and how?
hi this is divya. i have 2+ yrs exp in manual testing. I worked at bangalore. Now i shifted to chennai. If any openings for manual testing please call me 9245392708.thanks
what is the role of testlead in software testing
How to design the test cases?
What is the Waterfall Development Method and do you agree with all the steps?