Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


A power unit is there by the bank of the river of 750 mtrs
wide. A cable is made from power unit to power plant
opposite to tht of the river and 1500 mtrs away from the
power unit. the cost of cable above water and below water
is Rs12 and Rs 15. Find the total cost for cable laying ?

Answers were Sorted based on User's Feedback



A power unit is there by the bank of the river of 750 mtrs wide. A cable is made from power unit t..

Answer / sree

if rs 12 and rs 15 per meter then 750*12+750*15

Is This Answer Correct ?    9 Yes 1 No

A power unit is there by the bank of the river of 750 mtrs wide. A cable is made from power unit t..

Answer / ansari

cost for length in the water=750*12=9000
cost for length out of water=(1500-750)*15=11250

total cost==11250+9000=20250

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More General Aptitude Interview Questions

How many 3-digit numbers will be there which are divisible by 19?

0 Answers   Huawei,


Hai i am preparing for bank po of andhrabank please send some model papers on po

1 Answers   Indian Bank,


100 glasses are there. A servant has to supply glasses to a person If he supplies the glasses without any damage he will get 3 paise otherwise he will loose 3 paise. At the end of supplying 100 glasses if he gets 270 paise, how many glasses were supplied safely.

20 Answers   Lucent,


two trains are 2 kms apart. Speed of one train is 20m/s and the other train is running at 30 m/s. Lengths of the trains are 200 and 300m. In how much time do the trains cross each other?

0 Answers   Infosys,


What is the error in the given sequence. 2,3 6,7 14,15 29,46.

0 Answers   Celstream, Infosys,


A man shows his friend a woman sitting in a park and says that she the daughter of my grandmother's only son. What is the relation between the two

0 Answers   Canara Bank, EDS,


i got good 88% and 94% in 10th and 12th respectively.but now in engineering im getting in 70's.so suppose if they ask why have your academic performance went down in that case what should i tell??

4 Answers  


2,20,110,380,?

3 Answers  


In a certain code, LABOUR is written as KBAPTS. How is CANDID written in that code? (a) DBOEJE (b) DZOCJC (c) BBMCHC (d) BBMEHE (e) None of these

12 Answers  


what is meaning of robust (hewiitt)

3 Answers   Hewitt,


How do u write 6th may 2011 in 5 letters without using number??

9 Answers   IBM, Infosys, TCS,


A power unit is there by the bank of the river of 900 mtr width. a cable is made from power unit to power a plant opposite to that of the river and 3000 mtr away from the power unit. The cost of the cable bellows water Rs5 / mtr and cost of cable on the bank is Rs 4/ mtr. Find the total of laying the cable.

6 Answers   CTS, LIC, TCS,