when test plan is created?
Answer / ramprasad.s
HI
When Requirement Document is reviewed we can prepare the
Test Plan.
Test Plan is prepared based on the Requirement only.
sun_ramprasad@yahoo.com
| Is This Answer Correct ? | 2 Yes | 0 No |
What is the difference between system testing and integration testing?
Should testing be only after build and execution?
How can u swap 2 variables in C without using 3rd variable?
severity and priority of bugs?
What is Bicycle Testing?
what is meant by acid testing
In a system designed to work out the tax to be paid: An employee has £4000 of salary tax free. The next £1500 is taxed at 10% The next £28000 is taxed at 22% Any further amount is taxed at 40% To the nearest whole pound, which of these is a valid Boundary Value Analysis test case? The options provided are a)£1500 b)£32001 c)£33501 d)£28000
what is defect leakage?
what is boudarary value analysis? what is the use of it?
how cookie and session testing is done ?????
what is "test strategy"?
can you show me the test cases on registration form