What is the Capability Maturity Model (CMM)? At what CMM
level were the last few companies you worked?
hai frindz this is rajendra
SEI-CMM is one of the quality model among ISO,Six-Sigma..etc
CMM quality model defined by Carnegie Mellon University,US.
SEI-CMM most Powerful and sounding words in the current
software industry.
SEI -CMM is specially designed for software companies.
ISO -process improvement standard
but ISO lacking process measurement procedure
with out measurement no body can improve the process
But ISO quality standard can be implemented for any industry
organisation like police stations,airports,bus stands,small
companies of any kind.
SEI- Software Engineering Institute
CMM- Capability Maturity Model
CMM has 5 levels of maturity ,each levels shows process
maturity of the company.
level-1 Intial Maturity Level
level-2 Repeatable Maturity Level
Level-3 Defined Maturity Level
Level-4 Managed Maturity Level
Level-5 Optimising Maturity Lavel
In each level company will adapt some process quality
improvement standards.
CMM has 18 key process areas(KPA)
each key process area tells that state of functional
policies that are adapted.
CMM is a continuous process improvement model.
If a company reaches to CMM level 5 then it means
that it following quality procedure for implementaion of
projects?products during development.
Byeeeeee friendz
rajendra_penumalli@yahoo.com
Ring me at :9885162742
Hyderabad,
A.P
| Is This Answer Correct ? | 8 Yes | 0 No |
Explain Integration Testing?
Can anybody give answer for WHAT IS THE MEANING OF TRANSACTION BASED TESTING WITH EXAMPLE
What is context driven testing?
What is QA Life cycle
What is QMS,PMS,BMS
How do you determine which piece of software require how much testing?
Mention some of the types of software testing?
What is the strategy for automation test plan?
What do you think is the perfect test management system for test service vendors like me?
what is Cyclomatic Complexity?
Is it possible to do load testing in POWERMHS? If yes how do you do that?
Explain bug leakage and bug release?