Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Imagine 4 persons A,B,C,D.(It is a strength determining game). A found it hard,but could pull 'c' and 'd' to his side. AC and BD pairs on opposite sides found themselves equally balanced. When A and B exchanged their positions to form pairs AD and BC ,BC pair could win and pull AD to their side.Order the 4 persons in Ascending order according to their strengths.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More General Aptitude Interview Questions

What is clearing?

1 Answers   Genpact,


One man brought pen and book from 250 and he sold both at 10% profit on pen and 20% loss on book and finally he gained 40% what is the value of pen

0 Answers   Celstream,


A gardener plants 100 meters towards east, next 100 meters towards north,next 100 meters towards west. 98 meters towards east, 96 meters towards north and 96 meters towards west, 94 meters towards south. and 94 meters towards east and so on. If a person walks between the trees what is the total distance travelled by him before he reaches the center.

0 Answers   Infosys,


A can do a piece of work in 15 days, which B can do in 10 days. B worked at it for 8 days. A can finish the remaining work in

11 Answers   RRB, SSC,


Circumference of circle?

3 Answers   Yardi,


A power unit is there by the bank of the river of 750 mtrs wide. A cable is made from power unit to power plant opposite to tht of the river and 1500 mtrs away from the power unit. the cost of cable above water and below water is Rs12 and Rs 15. Find the total cost for cable laying ?

2 Answers   TCS,


i want the question paer of godrej boyance company in chennai who are onducting technical test for mechanical engg graduates

0 Answers   Godrej,


If in a certain code 'RANGE' is coded as 12345 and 'RANDOM' is coded as 123678, then the code for the word 'MANGO' would be

12 Answers   Cli3l, Infosys, Wipro,


If there are 1024*1280 pixels on a screen and each pixel can have around 16 million colors Find the memory required for this?

0 Answers   3i Infotech, Canara Bank, EDS,


Can anyone send me SBI clerical staff exam model question paper to my mail id. Sandhya.b12@gmail.com

0 Answers  


In Madras, temperature at noon varies according to -t^2/2 + 8t + 3, where t is elapsed time. Find how much temperature more or less in 4pm to 9pm.

0 Answers   Accenture, BSNL,


In a party there are women and cats.There are 18 heads and 72 legs altogether. How many women and cats?

0 Answers   Huawei,


Categories