A finish the work in 10 days. B is 60% efficient than A. So hoW days does B take to finish the work?
No Answer is Posted For this Question
Be the First to Post Answer
The following question asked at Infosys campus recruitment held at Pragathi. If 1>= y > x and xy=z.which of the following is not true? i)z>0 ii)x=z iii)y=z iv)z>y
types of shares
What is the equivalent compound ratio of 5:6::7:10::6:5?
If today is Saturday, what day will be 500 days from today?
The day before yesterday was WEDNESDAY then the day after tomorrow is?
one question has last part like difference between two terms is 9 and product of two numbers is 10, what is the squares of sum of numbers?
I HAVE APPLIED RRB EXAM. SO IWANT TO MODEL OUESTION PAPERS (DEGREE)
A certain type of mixture is prepared by mixing brand A at Rs.9 a kg. with brand B at Rs.4 a kg. If the mixture is worth Rs.7 a kg., how many kgs. of brand A are needed to make 40kgs. of the mixture?
In which of the system a) decimal no. 384 is equal to 1234 b)decimal no. 362 is given by (1362)x in the X system of numbers.
a block of ice floats on water in a beaker, as the ice melts,the water level in the beaker will
A man driving the car at twice the speed of auto oneday He was driven car for 10 min. And car is failed. He left The car and took auto to goto the office .He spent 30 min. In the auto. What will be the time take by car to go office? (A) 25 (b) 30 (c) 35 (d) none
A person buy the 6, 1 Rs stamps and 7, 50 paisa stamps he has given 12 Rs how much he will get back.