Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Can a computer flat screen hooked up to a fish finder?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Marine Engineering Interview Questions

A steel column 3 m hight is of hollow square section, 200 mm outside dimension and 20 mm wall thickness. (young's modules E=210*10^9) calculate A: the compressive load which will give a stress of 60 MN/m^2 in column. B: the compression o the column under the load in (A).

0 Answers  


Explain the difference between mitsui man b&w and hitachi man b&w engines?

0 Answers  


In ship cranes, there is a provision of providing a conveyor for the cable there is no provision of slip ring. Then explain how it is possible ?

0 Answers  


Can a computer flat screen hooked up to a fish finder?

0 Answers  


How square root can be calculated from manometer?

0 Answers  


I want to get or know the interview questions often ETOs are asked .

0 Answers  


Which country level is below low sea level?

0 Answers  


The place where happen iron losses?

0 Answers  


which country level having below the means sea level?

2 Answers  


what is the purpose of o-ring,wearrings in the centrifugal pumps?

4 Answers   Torm,


dear all i am a civil engineer (diploma) have 9 years experiance in construction fields and specalised works. (have oil and gas experiance also) i am willing to work in offshore rig jobs? what is the basic qualifications of that job? i need some advice and idea from offshore members? pls post the answers for me sirs. thank you

1 Answers  


star connection for a 3 phase induction motor gives reduced starting current.but 1.732 times the rated current during run up period if the motor was designed to run on delta. Why can't we design the motors to run on star connection instead. It will remove the starting arrangement required making the construction an operation much simpler.

1 Answers   Synergy, VR Maritime,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)