model question papers of GrayOrange company
No Answer is Posted For this Question
Be the First to Post Answer
A man, a woman, and a child can do a piece of work in 6 days. Man only can do it in 24 days. Woman can do it in 16 days and in how many days child can do the same work? (WITH EXPLANATION)
MY QUERY IS REGARDING AS/400. I AM FACING A PROBLEM IN UPDATING A PF COZ IT IS GETTING LOCKED SO I USED CHAIN(N) INSTEAD OF ONLY CHAIN.I ALSO TRIED UPDATE(E) ALONG WITH CHAIN(N),ITS NOT GIVING ANY ERROR BUT AT THE SAME TIME NOT UPDATING THE PF
Who secured the first hat trick in the 20 - 20 match ? a) symond b)balaji c) muthaiya muralidharan
Whay we use gigabite ethernt
can i learn ad. java without learned core java? java is best or .net is best for summer training?
I want to join for load runner training..please suggest me which is the best institute for load runner training in bangalore?
What is CRC? the material will be used in electrical stampings.
What a test plan contains
java support which type of polymorphism??runtym or compile tym or both??
What are daemon Threads?
to which generation of prog. languages does ai prog languages belong
if a customer's blackberry stopped syncing their calendar wirelessly what would you do?if a customber deleted mail from his blackberry but it did delete from his mailbox how would ypu resolve this
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)