A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .
No Answer is Posted For this Question
Be the First to Post Answer
what is mean by unity power factor?why are u calling Resistivity load also unity power factor?
High speed earth switch operation with diagram
0 Answers KSEB, L&T, Sanden Vikas, Siemens,
What is self exciting?
What are :- AC Distribution Board (Single & Double Front) DC Distribution Boards Distribution Board LT Breaker Panel.
How to calculate D.C load current?
diffrence between abcb and mocb
As per the theory current doesn’t flows in Neutral, but practically it is not applicable, explain why?
Transfer of electric power from primary to secondary in a transformer takes place A electrically B magnetically C electro-magnetically D conductively
in case of three phase induction motor,when it is connected to three phase supply,why the magnetic field is rotets around the armeture?
Please explain, how to test vector group of tranformer(Delta y1) . Thank
what kvrah y we need to take the readind of that
what is the static device rather than xmer which work on same principle as xmer?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)