Design an ETL process( batch job/script)from source to starting that u will
not be dependent on the source in the near future?please elobarate details
on what are things to consider.if you'd like to do a diagram that will be
great.please answer it
No Answer is Posted For this Question
Be the First to Post Answer
5. Explain about relational algebra.
What is the best database software for small businesses?
What is the differnce between Order by and Group by
hOW TO LOAD SOURCE INTO TARGET 2 TIMES?(INFORMATICA)
What are different types of blocks used in stored procedure?
what is difference between delete and truncet ?
can we delete autodiff back up that we have set through sql server agent.
0 Answers Indian Web Technology,
Define stored procedure?
a __________ is a virtual table made up of subset of actual table
What does specialization in DBMS mean?
Is hive a database?
What is a database string?
Oracle (3259)
SQL Server (4518)
MS Access (429)
MySQL (1402)
Postgre (483)
Sybase (267)
DB Architecture (141)
DB Administration (291)
DB Development (113)
SQL PLSQL (3330)
MongoDB (502)
IBM Informix (50)
Neo4j (82)
InfluxDB (0)
Apache CouchDB (44)
Firebird (5)
Database Management (1411)
Databases AllOther (288)