Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the difference beteween in specticle blind and slip
plate



What is the difference beteween in specticle blind and slip plate..

Answer / debdut sadhu

Purpose is same. For 8" and above lines instead of spec blind, spacer or slip plates are used. For 8"and less line sizes, spec blinds are provided. If you need to de-blind the line just reverse the spectacle blind. But in higher line sizes, a separate spacer to be provided of same rating for de-blinding the line.

Is This Answer Correct ?    2 Yes 1 No

Post New Answer

More Chemical Engineering Interview Questions

ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.19 : In the purchase of a unit of engineering office, a loan has been made to a bank with the following details : Term N = 30 years; interest rate R = 8.07 % / year; security : primary residence; present value pv = $450000; salary = $75000 / year or $56000 / year after tax. (a) Let the discounted present value PV = [ 1 - 1 / (1 + r) ^ n ] / r for arrears, where r = interest rate of discount, n = number of payment, ^ = symbol for power. If the loan repayment was made monthly : (i) calculate the value of r where r = R / k and R is in decimal value; (ii) find the value of n where n = kN; (iii) estimate the value of k where k = number of repayment per year; (iv) calculate the value of PV based on the formula of discounted present value. (b) Calculate the monthly repayment of the loan, MR based on the following formula : pv = PV x MR. (c) Find the percentage of salary remains after paying the loan every month.

1 Answers  


wt is inhand salary in hpcl as a officer in research and development?????

0 Answers  


how to decide reflux ratio & its calculation

1 Answers  


how did you spend today

0 Answers  


How is waste heat boilers categorized?

0 Answers  


can you explain about the design calculations and procedure of boiler

0 Answers   Reliance,


What are some common problems associated with dense phase pneumatic conveying?

0 Answers  


ENGINEERING PHYSICS - EXAMPLE 30.4 : (a) Time evolution in Heisenberg picture, according to Ehrenfest theorem is m (d / dt) < r > = < p >, where m = mass, r = position, p = momentum of a particle. If v = velocity, prove that m < v > = < p >. (b) Lande g-factor is given by Gj = Gl [ J (J + 1) - S (S + 1) + L (L + 1) ] / [ 2J (J + 1) ] + Gs [ J (J + 1) + S (S + 1) - L (L + 1) ] / [ 2J (J + 1) ]. If Gl = 1 and under approximation of Gs = 2, prove by calculation that Gj = (3/2) + [ S (S + 1) - L (L + 1) ] / [ 2J (J + 1) ].

1 Answers  


CHEMICAL ENERGY BALANCE - EXAMPLE 11.5 : According to Margules Equation, P = x(1) p(1) g(1) + x(2) p(2) g(2) for a two-component mixture where P is bubble pressure, x is mole fraction, p is saturation pressure, g is constant given by ln g(1) = x(2) A x(2). Find the value of A as a constant when P = 1.08 bar, p(1) = 0.82 bar, p(2) = 1.93 bar in a 50 : 50 mole fraction mixture. Estimate the pressure required to completely liquefy the 30 : 70 mixture using the same equation, by proving P = 1.39 bar. Take note that ln g(2) = x(1) A x(1), ln g(1) = x(2) A x(2).

1 Answers  


Question 40 - A stream with volumetric flow rate Q enters a cylindrical tank and a stream with volumetric flow rate q exits the tank. The fluid has a constant heat capacity and density. There is no temperature change or chemical reaction occurring in the tank. Develop a model for determining the height of the tank, h. Let V is the volume, A is the cross sectional area, r is the density, m is the mass, where V and A are for the tank, r and m are for the fluid. The rate of mass of fluid accumulation, dm / dt = (Q - q) r. Prove the model to be dh / dt = (Q - q) / A.

1 Answers  


which chemical reaction has the maximum evolution of heat?

3 Answers   IOCL,


ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.27 : A biochemical engineering consultancy applies construction accounting in its finance. Its project began on 1 January 2010. Total revenue generated from the project was $9000. On 1 January 2011 as the budget, $2000 had been spent, with $6000 expected. However, the project cost increased latter, causing deviation from its initial budget on 1 January 2012, where $7000 had been spent, with $1400 expected. Let (estimated total cost) = (spent cost) + (expected cost to be spent), (percentage completion) = 100 (spent cost) / (estimated total costs), (total expected profits) = (total revenue) - (estimated total costs). Calculate : (a) total expected profits on 1 January 2011 and 1 January 2012; (b) estimated total cost as and not as the budget; (c) percentage completion of the project since the project began, in the first and second years.

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)