From which end do you start deshuttering in
a) cantilever portion
b) simply supported portion

Answers were Sorted based on User's Feedback



From which end do you start deshuttering in a) cantilever portion b) simply supported portion..

Answer / guest

a) cantilever portion: deshuttering from fixed end to free
end

b) simply supported: deshuttering from both supported ends
to centre

Is This Answer Correct ?    21 Yes 3 No

From which end do you start deshuttering in a) cantilever portion b) simply supported portion..

Answer / subhasbabu

FOR CANTILEVER PORTION STARTS THE DESHUTTERING FROM THE
SUPPORTED END, AND FOR THE SIMPLY SUPPORTED ALSO STARTS FORM
THE SUPPORTED ENDS

Is This Answer Correct ?    7 Yes 5 No

From which end do you start deshuttering in a) cantilever portion b) simply supported portion..

Answer / bipul kalita

for cantilever slab or beam, support to be released from free end to fixed end and in simply supported beam/slab release of support to be starts from mid span to support span in both direction

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Which type of question ask for written test for civil diploma trainee

1 Answers   Power Grid,


what is the mix design for M:60 with micro silica andmetakaoline?

0 Answers   L&T,


HOW TO CALCULATE REINFORCMENT IN STAIRCASE CRANKED BEAM

1 Answers   CCCL, L&T,


how much quantity of binding wire required for tieing of 1mt of reinforcement bar?

5 Answers  


How to calculate lap,bond and hook length for preparing bar Bending schedule ?

11 Answers   L&T, Saudi Aramco Shell Refinery Company SASREF, Sunil Hitech Engineers, Tempus, Zain United Arabian,






Which standard describes the tolerance limit for undulation of RCC wall/ after POP surface?

1 Answers  


which type of test carrying on the cement & why

1 Answers   LG Soft,


What is the diff between cad & cadd?

0 Answers  


The point of contraflexure occurs in

10 Answers  


what is mean by shear resistance in concrete?

3 Answers   CCCL, Noble Consolidated Glazings, Sobha Developers,


if we get water mor from 28 days to the rcc concret is this better or have a damag

3 Answers  


why provide water stopper in costruction joits

1 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)