What will you do when you were given two different projects
and asked to complete them at same time?
Answers were Sorted based on User's Feedback
Answer / hsnk
hi, you are simply said i dont want to do both projects at a time i will complete that first one after that i will do
| Is This Answer Correct ? | 7 Yes | 5 No |
Answer / bishnu
I cannot work on two projects on the same this may lead to missing issues. . I will rather work on the most prior task 1st and then work for the 2nd one.
In case is i have a doubt of getting stuck in the middle of any task then i will work on the simple one 1st and the complex one latter.
| Is This Answer Correct ? | 0 Yes | 0 No |
What factors do you consider while estimation test efforts?
wat is the format of the build (the testers) get from dovelopers?
What is mean by Defect Metrics? Write some defect metrics?
What ishigh severity, low priority bug?
When priority and Severity is opposite then which one required to solved first? Bug Number 1=(Severity 1 & priority 3), Bug Number 2=(severity 3 & priority 1), (high=1,Medium=2,Low=3)
Who is responsible for doing "Cause-Effect GraphCause Effect Graph". If tester is responsible then how we to do it? Urgent
What is Low level design & High level design? and brief description.
Explain the difference between alpha testing and beta testing.
what is spiral model?
When are the followings prepared: 1.Software Test Plan 2.User Acceptance Test Plan
write 3 test cases on ATM for security purpose
hi this is sunitha yagnamurthy ...what r the certification in testing and hoe to apply that certificaation and what r the topics we will studying in testing...... please anybody explain that process