What will you do when you were given two different projects
and asked to complete them at same time?
Answers were Sorted based on User's Feedback
Answer / hsnk
hi, you are simply said i dont want to do both projects at a time i will complete that first one after that i will do
| Is This Answer Correct ? | 7 Yes | 5 No |
Answer / bishnu
I cannot work on two projects on the same this may lead to missing issues. . I will rather work on the most prior task 1st and then work for the 2nd one.
In case is i have a doubt of getting stuck in the middle of any task then i will work on the simple one 1st and the complex one latter.
| Is This Answer Correct ? | 0 Yes | 0 No |
You have URL address it is opening fine with your team member system but it is not opening in your system browser? How will you come across?
if a project is long term project , requirements are also changes then test plan will change or not?why
I write the test cases in Excel Sheet. For Retesting how to maintain the excel sheet.? Hw to maintain the History?
What do we need to build a quality QC team ? a QC manager with all junior QCs or a QC manager with all senior QCs?
hi tell me different testing methodologies
What do you mean by coverage and what are the different types of coverage techniques?
What is difference between Client-Server and Web based architecture.?
2 Answers Disha Tech, Verisoft,
on what basis low,medium,high,critical will be assigned to a bug.give m examples
As a testing engineer what to do if same defect is occured again in the software??
What is the difference between SIT AND IST?
When should testing start in a project?
What is the difference between windows application and Client server application ?