what is the basic difference between Coloumn & Shear Wall
No Answer is Posted For this Question
Be the First to Post Answer
why 50% more is assumed while calculating dry volume of coarse and fine aggregates in concrete calculations.whether 50% more is correct? How is it decided? whether the same is applicable to cement volume. Also what about cement mortar dr volume? How much more is to be considered for dry volume of mortar.
by which IS Code bend correction is two times of the dia meter of steel is taken
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
what happens when the curing is not done properly for structures ??
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
Lapping Work Explain Briefly
pls explain me the design procedure of multistorey building including structural analysis and also with example by considering the effect of wind load and earthquake load ?
What is geographic meridian?
How to calculate the quantity of water in cement mortar eg. CM 1:3?
As a site engineer what do you check in foundation before concreting
How you can use different dimension tools in cad? What are the different dimensions available?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)