SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING
WORK?
No Answer is Posted For this Question
Be the First to Post Answer
reinforcement lapping for short pile and long pile
What is braced excavation all about?
How we can calculate cement and sand for a wall 25ft x 28ft.Thickness of wall is 9inches.
what is the unit for sbc of soil
what is your role of in previous company as a construction manager
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
0 Answers Era Infra Engineering, Tricom,
How many square meter can a worker/labor demolish a structure per day?
We use d*d/162 formula to get the weight value of steel per m, what is 162 in this formula?
What is the design mix? What is the proportion for M25, M35, M40 concrete mix.
9 Answers ACC, DBM, Era Infra Engineering, Thakural Constructions,
Building construction
HOW TO FIND OUT THE QUANTITY OF CONCREATE
How to Calculate no.of bricks in 1sq.mtr