what is test initiation criteria in software testing
Answers were Sorted based on User's Feedback
Answer / kali krishan
Timing: As soon as we have a software requirements
(baseline).
Objective: To trap requirements-related defects as early as
they can be identified.
Approach: Test Requirements.
| Is This Answer Correct ? | 8 Yes | 1 No |
Answer / suchita
Time once requirements are freezed, test can be initiated
| Is This Answer Correct ? | 1 Yes | 2 No |
difference between arrays and linked list in c language?
What does balanced amplifier consist of?
what is the difference between oracle 8i and 9i. if someone could help me out.
what things abutsbi
0 Answers State Bank Of India SBI,
display the second highest salary department wise in employee table
What is spooling and buffering?
Why there is Powerfactor difference when we compare to our Capacitive Panel and TNEB side?
what is your career objective?
Explain what are db_options used for?
how does data cleansing framework works?
HOW WE CAN CORRELATE THE MA\ECHANICAL POWER TO ELECTRICAL POWER. SUPPOSE IF I WANT A PUMP OF PUMPIG 200 LPM AT 20 METER HEAD MENAS WHAT IS THE POWER NEEDED FOR PUMP IN ELECTRCAL AND HOW CAN WE GET IT
to print greatest of two integers without using >,<,=.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)