i have a project manager round on sat this week can you post
what are the main question i have to check.if you have any
idea regular question on project pls send me.
thanks in advance
Answers were Sorted based on User's Feedback
Answer / sai
1.reason for job change?
2.tell me about ur professional summary
3.project details
Is This Answer Correct ? | 5 Yes | 1 No |
Answer / reddy m lekkala
Briefly tell me about your project?
tell me about your academic details?
why should you leave your present job?
what are your strengths and weeknesses?
Is This Answer Correct ? | 2 Yes | 2 No |
explain how to create SCD-2 IN DATASTAGE 7.5X2 PLZ EXPLAIN WITH 4 OR 5 RECORDS TAKE IT EXAMPLE AND JOB DESINGN URGENT
create a job that splits the data in the Jobs.txt file into four output files. You will direct the data to the different output files using constraints. • Job name: JobLevels • Source file: Jobs.txt • Target file 1: LowLevelJobs.txt − min_lvl between 0 and 25 inclusive. − Same column types and headings as Jobs.txt. − Include column names in the first line of the output file. − Job description column should be preceded by the string “Job Title:” and embedded within square brackets. For example, if the job description is “Designer”, the derived value is: “Job Title: [Designer]”. • Target file 2: MidLevelJobs.txt − min_lvl between 26 and 100 inclusive. − Same format and derivations as Target file 1. • Target file 3: HighLevelJobs.txt − min_lvl between 101 and 500 inclusive. − Same format and derivations as Target file 1. • Rejects file: JobRejects.txt − min_lvl is out of range, i.e., below 0 or above 500. − This file has only two columns: job_id and reject_desc. − reject_desc is a variable-length text field, maximum length 100. It should contain a string of the form: “Level out of range: <min_lvl>”, where <min_lvl> is the value in the min_lvl field. My Question is how do you write the stage variable for reject rows.
What r the existing server jobs in parallalism?
how many datamarts we will use in real time project and when will use the datamart?pls send the replay early
source contains 2 columns comes to target 4 columns how
Can we use target hash file as a lookup ?
What is orabulk stage?
Hi Gus, Can u pls tell me How can u Call the Shell Scripting/Unix Commands in Job Sequence?
I have a few records just I want to store data in to targets cycling way how?
What modeling tool do you use?
data stores in which location while using data set stage as the target?
I HAVE EMP TABLE, 4 COLS R THERE COL1,COL2,COL3,COL4 ID-- 101,102,103,104 SAL-- 1000,4000,2000,5000 DATE-- COLUMN. I WANT TO DISPLAY THE DATA PREVIOUS MONTH HIGEST SAL ?