What are the scheduling options to run a sesion?
Answers were Sorted based on User's Feedback
Answer / saral
We can't schedule to run a session. But we can schedule to
run a workflow.
| Is This Answer Correct ? | 8 Yes | 0 No |
Answer / swetha
yoU can shedule a session to run at a given time or
intervel,or u can manually run the session.
Different options of scheduling
Run only on demand: server runs the session only when user
starts session explicitly
Run once: Informatica server runs the session only once at a
specified date and time.
Run every: Informatica server runs the session at regular
intervels as u configured.
Customized repeat: Informatica server runs the session at
the dats and times secified in the repeat dialog box.
| Is This Answer Correct ? | 5 Yes | 2 No |
What is hash partition?
How do you recover rows from a failed session
In informatics server which files are created during the session rums?
without table how to come first record only in oracle?
can we use self join in informaitca?
create a mapping to retrieve the employees who are getting salary greater than average salary?
Suppose we have a source qualifier transformation that populates two target tables. How do you ensure tgt2 is loaded after tgt1?
what is the monster dimension plz give me one example
S1 is having 1 lakh records and s2 is having 100 records, s2 should compare s1 if emp no is same data should be updated if not their it should insert the data.what are the transformation used?
Differentiate between Load Manager and DTM?
what is service oriented architecture in Informatica 8 version
1 Answers Cap Gemini, IBM, Systech, TCS,
Explain the types of lookup transformation?