entry criteria and exit criteria for unit testing, integration
testing, system testing and uat
Answer / amulyaranjan behera
Entry Criteria
• Build notes is provided to APT team.
• All defect logged during earlier phases (Requirements, Design or Development) and planned to be fixed during APT phase are logged in Test Management software with a target resolution date.
• Business Analysts, Technical Architects, Developers, DBAs (Database Administrators), build deployment and support resources are identified and are made available as required during APT (Application Product Phase) testing.
• RTM (Requirements Traceability Matrix) is signed off by required stakeholders.
• Test Closure Report for AT (Assembly Testing) is signed off by required stake holders.
Exit Criteria
• All planned Test Scripts of Pass3 are executed and 95% of the Pass3 Test Cases have passed.
• Any Application Product Test Cases that are marked as NA (Not Applicable) should be reviewed and approved prior exiting APT (Application Product Test).
• There are no open/pending Severity 1 and Severity 2 defects, any pending Severity 3 and Severity 4 defects can be deferred only if they have been reviewed and approved by UAT users, Business users and other project stake holders.
• All the defects found pre-APT phases are closed or deferred by taking approval from all the required stake holders.
• Application Product Test resources, Business Analysts, Technical Architects, Developers, DBAs (Database Administrators), build deployment and support resources are identified and are made available for next phase of testing IPT (Integration Product Test).
• Test Closure Report for APT (Application Product Test) is signed off by required stake holders and handed off to IPT (Integration Product Test) team lead.
• Following deliverables are completed and signed off (Test approach, Test conditions and Expected results, Test scenarios, Test scripts, and common Test data sheet) before APT (Application Product Test) can start.
• APT (Application product test) environment is ready in terms of Hardware, Software and Build and is made available for APT team.
• Build deployed in Application Product Test environment has met the Exit Criteria defined for Assembly Testing.
• There are no pending Severity 1 Defects logged during Unit Testing or AT (Assembly Testing) phases.
| Is This Answer Correct ? | 1 Yes | 0 No |
what are the testing strategies to be followed in testing banking applications?
how do u do integration testing supose u ar in hotmail login page 2nd is mailing page how do u do integration testing for this kind
What is the difference between sanity testing and smoke testing
Can anybody explain me Statement coverage with a example. Thanks..
What is bug life cycle?
How u can do regration testing/retesting testing, after assign bug to devloper, how to manage the test cycle number and built number, plz tell me....
You are given two scenarios to test. Scenario 1 has only one terminal for entry and processing whereas scenario 2 has several terminals where the data input can be made. Assuming that the processing work is the same, what would be the specific tests that you would perform in Scenario 2, which you would not carry on Scenario 1?
what are the factor taken under website testing manually?
with multiple testers how does one know which test case are assigned to them?Folder structure.Test process
contents of test plan
this question i got from iflex anybody pls give some useful information. is it possible to get severity1bugs in thirds round testing before release after two rounds of system testing completed?
There is a defect leekage to production environment after release. How to convince the client and what has to be done to retain the client