What is the V-model?
Answers were Sorted based on User's Feedback
Answer / sonal.pagare
Waterfall Model vs V-Model
In Waterfall Model the tester role will take place only in
the test phase. In V-Model role will take place right from
the requirement phase itself.
Waterfall model is a fixed process that u can't make any
changes in the requirement or in any phase. In V-Model u can
make any change in the requirements.
Waterfall model is a continuous process. V-model is the
simultaneous process.
Waterfall model used only after the requirements are fixed.
V-model can be used for any type of requirement (Uncertain
requirement).
Any mistake in Requirement phase can't be recognized in
water fall model until near the end when customer gets to
see the product. This leads to huge cost of correctives in
terms of economy. So it is time consuming too. Here for each
and every phase of the software life cycle there is a review.
Reduce the probability of occurring a mistake or defect.
Hence saves the cost. It saves time.
Emphasizes the development cycle and ignores the testing
cycle. Testing merely get time as development phase takes
almost 98% of project time. Gives equal importance to the
testing phase as development.
Waterfall model stages:
1.User Requirement
2.System Requirement
3.Global Design
4.Detailed Design
5.Implementation
6.Testing
V model stages:
1.Component testing
2.Integration Testing
3.System Testing
4.Acceptance Testing
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / madhu
It is also called as verification and validation model where
both the development activities and testing activities will
start all most all at the same with same
requirements.development team does analysis and development
and testing team does planing,scripting and testing.that
means it is the parallel process of both testing and
development.
In this model testing involves in each every stage of SDLC
to identify the defects as soon as possible in the early
stages and this model we do 2 types testing Static and
Dynamic testing.
Testing involved in customer requirements,system
requirements,design and coding will come under static
testing.where as testing involved in Unit
testing,integration testing,System testing and UAT will come
under Dynamic testing.
| Is This Answer Correct ? | 1 Yes | 0 No |
I was asked with 4+ expeirence - How did you involve in implementing QA Standards and guide lines in ur project.
When do you escalate issues to your Manager?
What is end-to-end testing when we will do that testing?
What is a Software process?
what is v model need clear explanation with advantages and disadvantages?
1.What is the different b/w error,defect,Bug?
Describe to me the Software Development Life Cycle as you would define it.
Should I write test case for sorting items? [If there are 1000 items & I have to sort them by name, code etc..]
I am new to testing, I need information about TSYS any website or if you have information please mail it to me. this is for online credit applications project.My mail id is keerthanakoluvu@yahoo.com. Thanks for your help.
0 Answers Bank Of America, TD,
When do you go for integration testing?
what is test case effective ness ?
what are the key components in your company testplan documents?