What is the V-model?
Answers were Sorted based on User's Feedback
Answer / sonal.pagare
Waterfall Model vs V-Model
In Waterfall Model the tester role will take place only in
the test phase. In V-Model role will take place right from
the requirement phase itself.
Waterfall model is a fixed process that u can't make any
changes in the requirement or in any phase. In V-Model u can
make any change in the requirements.
Waterfall model is a continuous process. V-model is the
simultaneous process.
Waterfall model used only after the requirements are fixed.
V-model can be used for any type of requirement (Uncertain
requirement).
Any mistake in Requirement phase can't be recognized in
water fall model until near the end when customer gets to
see the product. This leads to huge cost of correctives in
terms of economy. So it is time consuming too. Here for each
and every phase of the software life cycle there is a review.
Reduce the probability of occurring a mistake or defect.
Hence saves the cost. It saves time.
Emphasizes the development cycle and ignores the testing
cycle. Testing merely get time as development phase takes
almost 98% of project time. Gives equal importance to the
testing phase as development.
Waterfall model stages:
1.User Requirement
2.System Requirement
3.Global Design
4.Detailed Design
5.Implementation
6.Testing
V model stages:
1.Component testing
2.Integration Testing
3.System Testing
4.Acceptance Testing
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / madhu
It is also called as verification and validation model where
both the development activities and testing activities will
start all most all at the same with same
requirements.development team does analysis and development
and testing team does planing,scripting and testing.that
means it is the parallel process of both testing and
development.
In this model testing involves in each every stage of SDLC
to identify the defects as soon as possible in the early
stages and this model we do 2 types testing Static and
Dynamic testing.
Testing involved in customer requirements,system
requirements,design and coding will come under static
testing.where as testing involved in Unit
testing,integration testing,System testing and UAT will come
under Dynamic testing.
| Is This Answer Correct ? | 1 Yes | 0 No |
what r the differences between Testing on desktop application and Testing on client-server application while using QTP?oR while using MANUAL
is software testing easy ??? Give me perfect Ans.
What is mutation testing?? And when we use it??
What is non-functional testing?
Hi this is sridhar,iam working in a small organization and i have 1 year exp in manual testing,which type of questions will ask if i keep 1+exp in other companies.pls send your valuable suggestions for me.And my e-mail id is sridharraghava@gmail.com ne
4.what is deliverables?what are the things is included in the deliverables?
Tell me typical situation while collecting the test data in your job ( In banking project)? Please give the answer :Thanks in advance
What is Difference between White-box Testing and Unit testing?
6 Answers AZTEC, College School Exams Tests,
what r u r responsibilities in current project
Briefly explain what is Quality Assurance life cycle?
tell me different deft reports ?
How Far the ISTQB exam will help for our career.