In how we connect watt meter for open & short circuit test
of a single phase transformer.
Answers were Sorted based on User's Feedback
Answer / k.prakashchandra
For SC test ,the higher voltage side as sc is done on lower
voltage side usually. You can take as primary side for both
the tests
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / k.prakashchandra
connect it in the higher voltage side for SC test and in the
primary for OC test.
Is This Answer Correct ? | 3 Yes | 2 No |
Give the selection criteria of a 3 Phase transformer for industrial purposes ?
A synchronous machines has higher capacity for (1) Leading power factor (2) Lagging power factor (3) Does not depend upon the power factor of machine (4) None of the above
What is VCC?
what mean by power factor
At no load the PF of an alternator -Zero -Zero Lagging -Zero leading -None of the above
if the voltage across the lamp drops by 1%, the power drawn will be reduced by how many %?
State four criteria's for selection of site for nuclear power station.
Safety measures in air circuit breaker
5 Answers Megatron Solutions, TCS,
I am having a 1500 KVA transformer whose secondary current is 2086A and my connected load is 1000 KVA, I am having 400 KVAR APFCR for PF improvement what ratio of CT should i install in LT EB Bus to get optimum PF improvement?
what & how to check the lightning arrester
What is the function of the auto reclosure relay?
what is the differnce between high impedance relay and low impedance relay