what is the different between QA and test engineer?tell me
in brief?

Answers were Sorted based on User's Feedback



what is the different between QA and test engineer?tell me in brief?..

Answer / @mit

QA stands for Quality Assurance and QC stands for Quality
Control.

Test Engineers comes under QC bcoz the responsibilty of QC
Group are to Test the application before deliever it to
client.QC performs Validation thet includes actual testing
like Functional,Regression,Sanity and so on.

And QA group is the Process oriented and have the
reponisibilty verify and implementthat the Procees are
followed or not.QA are Proactive.QA perform verification
that includes Inspection,walkthrough,Audit and so on.

Generally,QA and QC(Test Engineers)both are seperate group
and both diffrent working.

Is This Answer Correct ?    19 Yes 0 No

what is the different between QA and test engineer?tell me in brief?..

Answer / ashish s

QA & Test Engineer, both are different apsects:
QA generally refers to 'Quality Assurance' and similarly
designation wise 'Quality Analyst', QA generally deals with
the Audits and Adherence to the defined Process in the
organization.

Whereas Test Engineer, deals with the testing of a
particular application and checking if all requirements are
taken care of or not.

Is This Answer Correct ?    2 Yes 3 No

what is the different between QA and test engineer?tell me in brief?..

Answer / balakiranm

Test Engineer: Testing the software,finding the defects ensure the application is working as per requirements is the responsibility to Quality Control(Test Engineer).
Quality Assurance: Defining the process in the company,Redefining the process if required is responsibility of Quality Assurance.
Quality control is working at project level,Quality assurance is responsible at organization level.

Is This Answer Correct ?    0 Yes 1 No

what is the different between QA and test engineer?tell me in brief?..

Answer / a.s.sudeeptheja

QA is an quality assurence department,in these department
they are keep on montering how the process is going on,it is
an post reveiw,validation is come under quality asurence
department,which control the process.
In terms of the test
engineeri is come under quality control department,it is an
standrad testingand it also called as verification(
contolling of an product)

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Manual Testing Interview Questions

What is the V-model?

2 Answers  


what are the different testing methodologies and testing techniques? Am asked in interview that what is the defect age? I replied that the time gap between the defect reporting and defect resolving. then the interviewer asked me if at all the defect is not resolved then what is the defect age of that particular defect? can anybody answer this?

3 Answers  


What are the baselined document needed to create Test case,Integration TEst case, System test case, Acceptance test case?

1 Answers  


hi what are the test cases for web application..i need these example..please..mail me at mina_ims@yahoo.com

0 Answers  


What is the significance of doing Regression testing?

11 Answers   Symphony,






How would you do the ollowing Security Testing for web application? 1) Authentication. 2) Authorization. 3) cookies. 4) penetration testing. 5) session testing. 6) encryption and decryption testing

1 Answers   TCS, Wipro,


About database testing,plz proide me the link for database testing doucments. Koteswar Rao

0 Answers  


What are the meetings conducted your company? Briefly Explain those Meetings(discussions on which topics)?

1 Answers  


Suppose one project is given to u.How do u know whether this project is suitable for manual testing or automation.

3 Answers   Exalt,


What is Traceability Matrix? How will you exactly map it and in which stage will you prepare that?

1 Answers   IBM,


1. What is the difference betwwen Test condition and Test Scenario 2. What is the differnce between Test Conditon and Test Scenario

1 Answers   Ness Technologies, Saitech Data Systems,


As a tester you are found a bug and you assigned dat bug to the correspondent developer.Then the developer not ready to accept that as a bug.what will you do?

1 Answers   ESW Consulting,


Categories